Silt Fence (
<br />SILT FENCE
<br />GEOTEXTILE
<br />COMPACTED
<br />BACKFILL
<br />EXISTING
<br />GROUND
<br />6" MIN
<br />AT LEAST 10"
<br />OF SILT FENCE
<br />"TAIL" SHALL BE
<br />BURIED
<br />1Y2"XI)," S
<br />(RECOMMENDED) WOODEN
<br />'FENCE POST WITH 10" MAX
<br />SPACING
<br />36"-48"
<br />TYP.
<br />18"
<br />MIN
<br />SILT FENCE
<br />POSTS SHALL OVERLAP
<br />AT JOINTS SO THAT NO GAPS
<br />EXIST IN SILT FENCE
<br />ROTATE
<br />In
<br />SECOND
<br />o
<br />0000 N
<br />caa
<br />POSTS SHALL BE JOINED AS
<br />CA
<br />SHOWN, THEN ROTATED 180 DEG.
<br />THICKNESS OF GEOTEXTILE HAS
<br />IN DIRECTION SHOWN AND DRIVEN.
<br />•o is t° a�.i
<br />P.Af�APGU
<br />BEEN
<br />EXAGGERATED, TYP
<br />INTO THE GROUND
<br />Q
<br />SECTION
<br />A
<br />SF -1.
<br />SILT
<br />FENCE
<br />SC -1
<br />November 2010 Urban Drainage and Flood Control District SF -3
<br />Urban Storm Drainage Criteria Manual Volume 3
<br />SC -1 Silt Fence (SF)
<br />SILT FENCE INSTAI I ATION NOTES
<br />S
<br />1. SILT FENCE MUST BE PLACED AWAY FROM THE TOE OF THE SLOPE TO ALLOW FOR WATER
<br />PONDING. SILT FENCE AT THE TOE OF A SLOPE SHOULD. BE INSTALLED IN A FLAT LOCATION
<br />AT LEAST SEVERAL FEET (2-5 FT) FROM THE TOE OF THE SLOPE TO ALLOW ROOM FOR
<br />PONDING AND DEPOSITION,
<br />2. A UNIFORM 6" X
<br />4' ANCHOR TRENCH SHALL BE EXCAVATED USING TRENCHER OR SILT
<br />FENCE INSTALLATION DEVICE. NO ROAD GRADERS, BACKHOES, OR SIMILAR EQUIPMENT SHALL
<br />BE USED.
<br />3. COMPACT ANCHOR TRENCHY
<br />8 HAND WITH A "JUMPING BY W JACK" ft
<br />A 0 HEEL ROLLING.
<br />COMPACTION SHALL BE SUCH THAT SILT FENCE RESISTS BEING PULLED OUT OF ANCHOR
<br />TRENCH BY HAND,
<br />4. SILT FENCE SHALL BE PULLED TIGHT AS IT IS ANCHORED TO THE STAKES. THERE SHOULD
<br />BE NO NOTICEABLE SAG BETWEEN STAKES AFTER IT HAS BEEN ANCHORED TO THE STAKES,
<br />5. SILT FENCE FABRIC SHALL BE ANCHORED TO THE STAKES USING 1 HEAVY DUTY STAPLES
<br />OR NAILS WITH I" HEADS. STAPLES AND NAILS SHOULD BE PLACED 3" ALONG THE FABRIC
<br />DOWN THE STAKE,
<br />6, AT THE END OF A RUN OF SILT FENCE ALONG A CONTOUR, THE SILT FENCE SHOULD BE
<br />TURNED PERPENDICULAR TO THE CONTOUR TO CREATE A "J -HOOK." THE "J -HOOK"
<br />EXTENDING PERPENDICULAR TO THE CONTOUR SHOULD BE OF SUFFICIENT LENGTH TO KEEP
<br />RUNOFF FROM FLOWING AROUND THE END OF THE SILT FENCE (TYPICALLY 10' - 20").
<br />7. SILT FENCE SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES.
<br />SILT FENCE MAINTENANCE NOTES
<br />1. INSPECT BMPs EACH WORKDAY, AND MAINTAIN THEM IN EFFECTIVE OPERATING CONDITION.
<br />MAINTENANCE OF BMPs SHOULD BE PROACTIVE, NOT REACTIVE. INSPECT BMPs AS SOON AS
<br />POSSIBLE (AND ALWAYS WITHIN 24 HOURS). FOLLOWING A STORM THAT CAUSES SURFACE
<br />EROSION, AND PERFORM NECESSARY MAINTENANCE.
<br />2. FREQUENT OBSERVATIONS AND MAINTENANCE ARE NECESSARY TO MAINTAIN BMPs IN
<br />EFFECTIVE OPERATING CONDITION.: INSPECTIONS AND CORRECTIVE MEASURES SHOULD BE
<br />DOCUMENTED THOROUGHLY,
<br />3. WHERE BMPs HAVE FAILED, REPAIR OR REPLACEMENT SHOULD BE INITIATED UPON
<br />DISCOVERY OF THE FAILURE.
<br />4. SEDIMENT ACCUMULATED UPSTREAM OF THE SILT .FENCE SHALL BE REMOVED AS NEEDED
<br />TO MAINTAIN THE FUNCTIONALITY OF THE BMP, TYPICALLY WHEN DEPTH OF ACCUMULATED
<br />SEDIMENTS IS APPROXIMATELY 6".
<br />5. REPAIR OR REPLACE SILT FENCE WHEN THERE ARE SIGNS OF WEAR, SUCH AS SAGGING,
<br />TEARING, OR COLLAPSE.
<br />6. SILT FENCE IS TO REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED
<br />AND APPROVED BY THE LOCAL JURISDICTION, OR IS REPLACED BY AN EQUIVALENT PERIMETER
<br />SEDIMENT CONTROL BMP,
<br />7. WHEN SILT FENCE IS REMOVED, ALL DISTURBED AREAS SHALL BE COVERED WITH TOPSOIL,
<br />SEEDED AND MULCHED OR OTHERWISE STABILIZED AS APPROVED BY LOCAL JURISDICTION.
<br />(DETAIL ADAPTED FROM TOWN OF PARKER, COLORADO AND CITY OF AURORA, NOT AVAILABLE IN AUTOCAD)
<br />,NOTE: MANY JURISDICTIONS HAVE BMP DETAILS THAT VARY FROM UDFCD STANDARD DETAILS.
<br />CONSULT WITH LOCAL JURISDICTIONS AS TO WHICH DETAIL SHOULD BE USED WHEN
<br />DIFFERENCES ARE NOTED.
<br />SF -4 Urban Drainage and Flood Control District November 2010
<br />Urban Storm Drainage Criteria Manual Volume 3
<br />Vehicle Tracking Control (VT
<br />SM -4
<br />VTC
<br />20 FOOT
<br />(WIDTH CAN BE
<br />LESS IF CONST.
<br />VEHICLES ARE
<br />PHYSICALLY
<br />CONFINED ON
<br />1 BOTH SIDES)
<br />SIDEWALK OR OTHER 50 FOOT (MIN.};
<br />PAVED SURFACE
<br />I�T
<br />PUBLIC
<br />ROADWAY
<br />INSTALL ROCK FLUSH WITH.
<br />OR BELOW TOP OF PAVEMENT
<br />9" (MIN)
<br />UNLESS OTHERWISE SPECIFIED
<br />BY LOCAL JURISDICTION, USE
<br />CDOT SECT. #703, AASHTO (13
<br />COARSE AGGREGATE OR 6"
<br />MINUS ROCK
<br />NON -WOVEN GEOTEXTILE FABRIC
<br />BETWEEN SOIL AND ROCK
<br />UNLESS OTHERWISE SPECIFIED BY LOCAL
<br />JURISDICTION, USE COOT SECT. #703, AASHTO
<br />#3 COARSE AGGREGATE � 9,. (MIN.)
<br />OR 6" MINUS ROCK
<br />m
<br />T
<br />NON -WOVEN GEOTEXTILE
<br />FABRIC
<br />SECTION A
<br />VTC -1. AGGREGATE VEHICLE TRACKING CONTROL
<br />November 2010 Urban Drainage and Flood Control District VTC -3
<br />Urban Storm Drainage Criteria Manual Volume 3
<br />SM -4 Vehicle Tracking Control (VTC)
<br />STABILIZED CONSTRUCTION ENTRANCE/EXIT INSTALLATION NO
<br />1. SEE PLAN VIEW FOR
<br />-LOCATION OF CONSTRUCTION ENTRANCE(S)/EXIT(S)..
<br />-TYPE OF CONSTRUCTION ENTRANCE(S)/EXITS(S) (WITH/WITHOUT WHEEL WASH,
<br />CONSTRUCTION MAT OR TRAP).
<br />2. CONSTRUCTION MAT OR TRM STABILIZED CONSTRUCTION ENTRANCES ARE ONLY TO BE
<br />USED ON SHORT DURATION PROJECTS (TYPICALLY RANGING FROM A WEEK TO A MONTH)
<br />WHERE THERE WILL BE LIMITED VEHICULAR ACCESS,
<br />3. A STABILIZED CONSTRUCTION ENTRANCE/EXIT SHALL BE LOCATED AT ALL ACCESS POINTS
<br />WHERE VEHICLES ACCESS THE CONSTRUCTION SITE FROM PAVED RIGHT-OF-WAYS.
<br />4. STABILIZED CONSTRUCTION ENTRANCE/EXIT SHALL BE INSTALLED PRIOR TO ANY LAND
<br />DISTURBING ACTIVITIES,
<br />5. A NON -WOVEN GEOTEXTILE FABRIC SHALL BE PLACED UNDER THE STABILIZED
<br />CONSTRUCTION ENTRANCE/EXIT PRIOR TO THE PLACEMENT OF ROCK,
<br />6. UNLESS OTHERWISE SPECIFIED BY LOCAL JURISDICTION, ROCK SHALL CONSIST OF DOT
<br />SECT. #703, AASHTO #3 COARSE AGGREGATE OR 6" (MINUS) ROCK.
<br />STABILIZED CONSTRUCTION ENTRANCE/EXIT MAINTENANCE NOTES
<br />1.. INSPECT BMPs EACH WORKDAY, AND MAINTAIN THEM IN EFFECTIVE OPERATING CONDITION,:
<br />MAINTENANCE OF BMPs SHOULD BE PROACTIVE, NOT REACTIVE INSPECT BMPs AS SOON AS
<br />POSSIBLE (AND ALWAYS WITHIN 24 HOURS) FOLLOWING A STORM THAT CAUSES SURFACE
<br />EROSION, AND PERFORM NECESSARY MAINTENANCE.
<br />2. FREQUENT OBSERVATIONS AND MAINTENANCE ARE NECESSARY TO MAINTAIN BMPs IN
<br />EFFECTIVE OPERATING CONDITION, INSPECTIONS AND CORRECTIVE MEASURES SHOULD BE
<br />DOCUMENTED THOROUGHLY.
<br />3. WHERE BMPs HAVE FAILED. REPAIR OR REPLACEMENT SHOULD BE INITIATED UPON
<br />DISCOVERY OF THE FAILURE,
<br />4. ROCK SHALL BE REAPPLIED OR REGRADED AS NECESSARY TO THE STABILIZED
<br />ENTRANCE/EXIT TO MAINTAIN A CONSISTENT DEPTH.
<br />5. SEDIMENT TRACKED ONTO PAVED ROADS IS TO BE REMOVED THROUGHOUT THE DAY AND
<br />AT THE END OF THE DAY BY SHOVELING OR SWEEPING. SEDIMENT MAY NOT BE WASHED
<br />DOWN STORM SEWER DRAINS,
<br />NOTE; MANY JURISDICTIONS HAVE BMP DETAILS THAT VARY FROM UDFCD STANDARD DETAILS,.
<br />CONSULT WITH LOCAL JURISDICTIONS AS TO WHICH DETAIL SHOULD BE USED WHEN
<br />DIFFERENCES ARE NOTED.
<br />(DETAILS ADAPTED FROM CITY OF BROOMFIELD, COLORADO, NOT AVAILABLE IN AUTOGO)
<br />VTC -6 Urban Drainage and Flood Control District November 2010
<br />Urban Storm Drainage Criteria Manual Volume 3
<br />Stabilized Staging Area (SSA) SM -6
<br />SF/CF - SF/CFF
<br />�i 'ONSI,TE v Q!)A
<br />�. CONSTRUCTION CONSTRUCTION
<br />VEHICLE -a TRAILERS
<br />PARKING (IF' iiiIILLL..JII
<br />" NEEDED)"
<br />CONSTRUCTION
<br />SITE ACCESS \ (A
<br />,� a
<br />EA
<br />3" MIN. THICKNESS
<br />GRANULAR MATERIAL
<br />CE
<br />STABILIZED »CONSTRUCTION ^ *4
<br />ENTRANCE (SEE rn
<br />DETAILS VTC -1
<br />TO VTC 3) ^ ^ SILT FENCE OR CONSTRUCTION
<br />SF/CF - SF/CF FENCING AS NEEDED
<br />EXISTING ROADWAY
<br />S5A-1. STABILIZED STAGING AREA
<br />STABILIZED STAGING AREA IN HAL TIL N JES
<br />1. SEE PLAN VIEW FOR
<br />-LOCATION OF STAGING AREA(S).
<br />-CONTRACTOR MAY ADJUST LOCATION AND SIZE OF STAGING AREA WITH APPROVAL
<br />FROM THE LOCAL JURISDICTION.
<br />2. STABILIZED STAGING AREA SHOULD BE APPROPRIATE FOR THE NEEDS OF THE SITE,
<br />OVERSIZING RESULTS IN A LARGER AREA TO STABILIZE FOLLOWING CONSTRUCTION,
<br />3. STAGING AREA SHALL BE STABILIZED PRIOR TO OTHER OPERATIONS ON THE SITE,
<br />4. THE STABILIZED STAGING AREA SHALL CONSIST OF A MINIMUM 3" THICK GRANULAR
<br />MATERIAL,
<br />5. UNLESS OTHERWISE SPECIFIED BY LOCAL JURISDICTION, ROCK SHALL CONSIST OF DOT
<br />SECT, #703, AASHTO #3 COARSE AGGREGATE OR 6" (MINUS) ROCK.
<br />6. ADDITIONAL PERIMETER BMPs MAY BE REQUIRED INCLUDING BUT NOT LIMITED TO SILT
<br />FENCE AND CONSTRUCTION FENCING.
<br />SLABIUZEO STAGING AREA MAINTENANCE NOTES
<br />1. INSPECT BMPs EACH WORKDAY, AND MAINTAIN THEM IN EFFECTIVE OPERATING CONDITION.
<br />MAINTENANCE OF BMPs SHOULD BE PROACTIVE, NOT REACTIVE. INSPECT BMPs AS SOON AS
<br />POSSIBLE (AND ALWAYS WITHIN 24 HOURS) FOLLOWING A STORM THAT CAUSES SURFACE
<br />EROSION, AND PERFORM NECESSARY MAINTENANCE.
<br />2. FREQUENT OBSERVATIONS AND MAINTENANCE ARE NECESSARY TO MAINTAIN BMPs IN
<br />EFFECTIVE OPERATING CONDITION. INSPECTIONS AND CORRECTIVE MEASURES SHOULD BE
<br />DOCUMENTED THOROUGHLY.
<br />3. WHERE BMPs HAVE FAILED, REPAIR OR REPLACEMENT SHOULD BE INITIATED UPON
<br />DISCOVERY OF THE FAILURE.
<br />4. ROCK SHALL BE REAPPLIED OR REGRADED AS NECESSARY IF RUTTING OCCURS OR
<br />UNDERLYING SUBGRADE BECOMES EXPOSED.:
<br />November 2010 Urban Drainage and Flood Control District
<br />Urban Storm Drainage Criteria Manual Volume 3
<br />SSA -3
<br />SM -6 Stabilized Staging Area (SSA)
<br />STABI117Fn STAGING AREA MAINTENANCE NOTES
<br />5. STABILIZED STAGING AREA SHALL BE ENLARGED IF NECESSARY TO CONTAIN PARKING,
<br />STORAGE, AND UNLOADING/LOADING OPERATIONS.
<br />6. THE STABILIZED STAGING T ZEO ST 0 NG AREA SMALL BE REMOVEDAT THE T
<br />END OF CONSTRUCTION. THE
<br />GRANULAR MATERIAL SHALL BE REMOVED OR, IF APPROVED BY THE LOCAL JURISDICTION,
<br />USED ON SITE, AND THE AREA COVERED WITH TOPSOIL, SEEDED AND MULCHED OR
<br />OTHERWISE STABILIZED IN A MANNER APPROVED BY LOCAL JURISDICTION,
<br />NM' MANY MUNICIPALITIES PROHIBIT THE USE OF RECYCLED CONCRETE AS GRANULAR
<br />MATERIAL FOR STABILIZED TA
<br />AB UZED 5 GING AREAS DUE TO DIFFICULTIES WITH RE-ESTABLISHMENT OF
<br />VEGETATION IN AREAS WHERE RECYCLED CONCRETE WAS PLACED.
<br />MANY JURISDICTIONS
<br />NOTE. HAVE BMP DETAILS THAT VARY FROM UDFCD STANDARD DETAILS.
<br />CONSULT WITH LOCAL JURISDICTIONS AS TO WHICH DETAIL SHOULD BE USED WHEN
<br />DIFFERENCES ARE NOTED.
<br />(OETAILR ADAPrEO FROM DOUGLASCOUNTY, COLORADO. NOT WAIUBLE IN AUTOCAD)
<br />SSA4 Urban Drainage and Flood Control District November 2010
<br />Urban Storm Drainage Criteria Manual Volume 3
<br />Know what's below.
<br />Call before you dig.
<br />RECEIVED
<br />JUL 0 6 2015
<br />G1WSIONOF RECLAMATION
<br />MNMANDSAFEJY
<br />M•w1s"I
<br />Do
<br />00 M
<br />z Inn
<br />>�oCN
<br />W .t'OJ fV
<br />>(,n8�
<br />>90
<br />v) '- m
<br />LLCTD'o�
<br />O O
<br />� U O
<br />W N N
<br />W
<br />LD C5 d
<br />LD r
<br />W �
<br />a
<br />Sheet:
<br />EiOG
<br />SHEET 2 OF 2
<br />In
<br />oA
<br />o
<br />0000 N
<br />ocDoAo
<br />CA
<br />•o is t° a�.i
<br />P.Af�APGU
<br />W
<br />Do
<br />00 M
<br />z Inn
<br />>�oCN
<br />W .t'OJ fV
<br />>(,n8�
<br />>90
<br />v) '- m
<br />LLCTD'o�
<br />O O
<br />� U O
<br />W N N
<br />W
<br />LD C5 d
<br />LD r
<br />W �
<br />a
<br />Sheet:
<br />EiOG
<br />SHEET 2 OF 2
<br />In
<br />W
<br />Q
<br />H
<br />�W�
<br />o
<br />P.
<br />Qq
<br />�a
<br />OU
<br />o
<br />`.J
<br />F
<br />N
<br />O
<br />CWSU
<br />LOL
<br />L�
<br />Do
<br />00 M
<br />z Inn
<br />>�oCN
<br />W .t'OJ fV
<br />>(,n8�
<br />>90
<br />v) '- m
<br />LLCTD'o�
<br />O O
<br />� U O
<br />W N N
<br />W
<br />LD C5 d
<br />LD r
<br />W �
<br />a
<br />Sheet:
<br />EiOG
<br />SHEET 2 OF 2