Laserfiche WebLink
VOLUME IX -TABLE OF CONTENTS <br />COAL MINE WASTE DISPOSAL AREA NO.2 <br />Introduction....................................................................................................................................................1 <br />GeneralPlan..................................................................................................................................................2 <br />Figure 2 <br />DetailedDesign.............................................................................................................................................4 <br />Figure 3 <br />Construction................................................................................................................................................... <br />6 <br />WaterControl Measures................................................................................................................................8 <br />Figure 5 <br />SedimentationPond....................................................................................................................................11 <br />Placementand Compaction........................................................................................................................13 <br />Inspection....................................................................................................................................................14 <br />Reclamation.................................................................................................................................................16 <br />StabilityAnalysis..........................................................................................................................................18 <br />• Huddleston -Berry Engineering and Testing (HBET) - (TR -98) Stability analysis of gob pile #2, dated <br />July 30, 2014 <br />• Huddleston -Berry Engineering and Testing (HBET) - (TR -97) Stability analysis of 0.1 Ac. of western <br />edge of gob pile #1, dated November 21, 2014 <br />• Huddleston -Berry Engineering and Testing (HBET) - (MR -171) Coverfill stockpile on top of gob pile <br />#2 dated September 19, 2014 <br />• Huddleston -Berry Engineering and Testing (HBET) - (TR -94) Coverfill stockpile on top of gob pile #2 <br />dated November 10, 2014. <br />• Huddleston -Berry Engineering and Testing (HBET) - (TR -85) Drying area on top of gob pile #2 dated <br />April 4, 2014. <br />• Buckhorn Geotech — (TR -81) Gob Pile #2 Revised Stability Evaluations dated July 29, 2013 <br />• Buckhorn Geotech — (TR -75) Gob Pile #4 Revised Stability Evaluations dated November 20, 2012 <br />• Buckhorn Geotech — (TR -76) Gob Pile #2 Expansion Stability Evaluations dated November 9, 2012 <br />• Buckhorn Geotech — (TR -75) As -built Evaluation of gob pile #4 dated September 7, 2012 <br />• Buckhorn Geotech — (TR -64) Revised Stability Evaluations dated May 18, 2009 <br />• Buckhorn Geotech — (TR -56) Revised Stability Evaluations dated September 22, 2008 <br />• Buckhorn Geotech — (TR -44) Geotechnical Report dated February 1, 2007 <br />• Buckhorn Geotech — (TR -42) Geotechnical Report dated February 15, 2006 <br />• Lambert & Associates - (TR -36) Geotechnical Engineering Study dated March 17, 2005 <br />• Lambert & Associates - (TR -36) Geotechnical Engineering Study dated January 13, 2005 <br />• Lambert & Associates - (TR -30) Geotechnical Engineering Study dated November 10, 2003 <br />Appendix A Material Balance <br />Appendix B Protection of the Hydrologic Balance <br />Appendix C Reclamation Estimate <br />Figure 1 <br />Coal Mine Waste Disposal Area <br />Figure 2 <br />Drainage Plans <br />Figure 3 <br />Pond F Detail <br />Figure 4 <br />Pond F Emergency Spillway Detail <br />Figure 5 <br />Borrow Areas #1 & 2 Final Configuration <br />TR -98 xiii 06/15 <br />