Laserfiche WebLink
PERMIT #: M-1977-342 <br />INSPECTOR'S INITIALS: PSH <br />INSPECTION DATE: July 1, 2015 <br />OBSERVATIONS <br />The surface and support facilities at the Henderson Mine were toured by the Division of Reclamation, Mining <br />and Safety (Division/DRMS). The following Division staff members were present on the tour; Peter Hays, Tyler <br />O'Donnell, Stephanie Mitchell and Michael Cunningham. The DRMS staff members are part of the new <br />Henderson inspection team for the Henderson Mine and will be conducting future inspections at the site. The <br />purpose of the tour was to familiarize the DRMS staff with the surface and support facilities at the Henderson <br />Mine. <br />The tour included observation of the following facilities; 5 shaft exhaust fans, oil storage building, hazmat <br />storage building, water surge tank, concrete batch plant, hoist building, Butler Gulch outfall, the potable water <br />treatment plant, the waste water treatment plant, the outfall of the west fork of Clear Creek, Pond 1.2, <br />monitoring wells MNGW-1, MNGW-3 and MNGW-4, and the URAD treatment plant and upper and lower <br />tailings ponds. <br />Henderson submitted a Henderson Closure Cost Model to the Division on June 30, 2015. The Division will <br />review the financial warranty cost estimate and contact Henderson staff with questions as needed. <br />A tour of the Henderson Mill facilities is scheduled for July 23, 2015. <br />Inspection Contact Address <br />Mr. Miguel Hamarat <br />Climax Molybdenum Company <br />19302 County Rd. #3 <br />Parshall, CO 80468 <br />Cc: Wally Erickson, DRMS <br />Page 2 of 2 <br />