Laserfiche WebLink
Upper Poudre Combined SWSP <br />June 26, 2015 <br />Table D - Final Reclamation Summary <br />Page 7 of 11 <br />Site Name <br />DRMS Permit <br />Final Reclamation <br />Bond <br />Amount <br />Comments <br />Associated Decrees <br />Ground water lakes requires plan for <br />92CW157 - Conditional storage <br />Home Office <br />Ground water lakes <br />$3,153,345 <br />augmentation to be filed three years <br />right for North Shores <br />Pit <br />prior to the completion of mining. <br />Reservoir. Requires lining. <br />Currently bonded for lining. <br />OOCW251 - Conditional storage <br />Overland <br />right for various reservoirs <br />Ponds Site <br />Lined reservoirs <br />$1,948,000 <br />Currently bonded for lining. <br />(collectively known as the <br />Overland Trail Reservoirs). <br />Requires lining. <br />North Taft <br />Ground water lakes requires plan for <br />92CW157 - Conditional storage <br />Hill Expansion <br />Ground water lakes <br />$470,124 <br />augmentation to be filed three years <br />prior to the completion of mining. <br />right for Taft Hill Reservoir. <br />Site <br />Currently bonded for backfilling. <br />Requires lining. <br />Conditions of Approval <br />hereby approve this substitute water supply plan, in accordance with Section 37-90-137(11), <br />C.R.S., subject to the following conditions: <br />1. This plan is approved with the effective date of January 1, 2015 and shall be valid through <br />December 31, 2015 unless otherwise revoked or modified. If this plan will not be made <br />absolute by a water court action by the plan's expiration date, a renewal request must be <br />submitted to this office with the statutory fee (currently $257 for each mining site) no <br />later than November 15, 2015. <br />2. Well permits have been obtained for the current use and exposed surface areas the three <br />subject pits in accordance with § 37-90-137(2) and (11), C.R.S. in conjunction with this plan. <br />Failure to maintain valid well permits may cancel approval of this plan. <br />3. The total surface area of the ground water exposed after December 31, 1980 for each of the <br />pits shall not exceed those values listed in Table A of this approval. Should the total surface <br />area exposed exceed those amounts, an amendment will need to be filed with this office. <br />4. The total amount of ground water to be appropriated from each of the pits shall not exceed <br />the values listed in Table B of this approval. <br />5. Approval of this plan is for the purposes as stated herein. Any additional uses of this water <br />must first be approved by this office. Any future additional historical consumptive use credit <br />given (e.g., agricultural water transfer) for these sites must consider all previous credits <br />given. <br />6. All releases of replacement water must be sufficient to cover all out -of -priority depletions in <br />time, place, and amount and must be made under the direction and/or the approval of the <br />water commissioner. The Applicant is required to notify the water commissioner any time <br />deliveries are made to the 8.5 -acre pond via the Taylor tt Gill Wasteway while the pond is <br />not spilling into the Cache La Poudre River. <br />7. The release of replacement water may be aggregated to maximize beneficial use. The water <br />commissioner and/or the division engineer shall determine the rate and timing of an <br />aggregated release. <br />8. The replacement water that is the subject of this SWSP cannot be sold or leased to any other <br />entity. As a condition of subsequent renewals of this SWSP, the replacement water must be <br />