My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-09_HYDROLOGY - M1977439
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977439
>
2015-07-09_HYDROLOGY - M1977439
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:03 PM
Creation date
7/13/2015 4:38:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977439
IBM Index Class Name
HYDROLOGY
Doc Date
7/9/2015
Doc Name
Combined Substitute Water Supply Plan
From
Div of Water Resources
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upper Poudre Combined SWSP Page 5 of 11 <br />June 26, 2015 <br />This SWSP relies on a quantification of average historical farm headgate delivery, consumptive <br />use, and associated return flow approved in previous SWSPs based on an analysis for 5.75 shares that <br />was performed for Lafarge West, Inc. by the Applegate Group, Inc. The 5.75 shares were determined to <br />have been used to irrigate a total of 104.5 acres. The historic average farm headgate delivery was <br />determined to be 41.79 acre-feet per share (2.30 acre-feet per irrigated acre). The historic <br />consumptive use was determined to be 21.36 acre-feet per share (1.17 acre-feet per acre). <br />For 2015, the Applicant proposes to dry -up, or to irrigate exclusively with non -Taylor ft Gill Ditch <br />water, a total of at least 239.5 acres associated with the subject 13.175 shares. The location of the <br />lands to be dried up for the 2015 irrigation season is shown on the attached Figure 2. The dry -up will <br />provide a total of 550.63 acre-feet of farm headgate delivery or 295.84 acre-feet of consumptive use <br />credit to be used for replacement of out -of -priority depletions under this SWSP. <br />The maximum monthly and annual volumetric farm headgate diversion limits for the subject <br />13.175 shares, based on the average monthly and annual farm headgate deliveries determined for the <br />5.75 shares, are shown in Table D below. <br />Table D - Maximum Volumetric Farm Headgate Diversion Limitations (acre-feet) <br />Apr May Jun Jul Aug Sep Oct Annual <br />5.75 shares 2.94 41.78 53.79 56.73 48.88 31.47 4.73 240.31 <br />Pro -rated for 13.175 shares 6.74 95.73 123.25 129.99 112.00 72.11 10.84 550.63 <br />It is anticipated that 357.42 acre-feet of farm headgate delivery associated with the Taylor Et <br />Gill Ditch shares will be delivered to the Upper Poudre Recharge Ponds (WDID 0302004) during the <br />period of May through October. Daily deliveries of the shares will be measured and any excess <br />deliveries will be sent directly back to the river without claiming augmentation credit. Excess water <br />will be returned to the river via the Taylor Et Gill Wasteway, as described in more detail below. <br />Evaporative losses from the water delivered to a series of three recharge ponds is estimated to total <br />6.84 acre-feet for this plan period, based on a maximum recharge pond surface area of 3.0 acres. The <br />net recharge accretions were lagged to the river using the AWAS model with the following parameters: a <br />distance (X) from the centroid of the exposed ground water surface to the river of 2,300 ft; a width (W) <br />of the aquifer of 6,500 ft; a transmissivity (T) of 160,000 gpd/ft; and a specific yield (S) of 0.2. Taylor Et <br />Gill Ditch shares have been diverted into the recharge ponds to produce accretions to the stream for <br />replacement purposes for the subject sites under previous SWSPs since 2004. Lagged recharge <br />accretions from past and projected (2015) deliveries are anticipated to total 297.10 acre-feet during <br />this plan period. The return flow obligations associated with the use of the Taylor Et Gill Ditch shares <br />will be calculated using the return flow factors shown in the attached Table 4, column E. Return flow <br />obligations during the summer period of April to September will be calculated by multiplying the <br />monthly delivery to recharge by its respective monthly factor. Obligations during winter months <br />(October through March) will be calculated by multiplying the previous year's annual delivery to <br />recharge (141.58 acre-feet for 2014) by its respective monthly factor. Any farm headgate delivery of <br />the Taylor Et Gill Ditch shares made in October will be included in the October return flow requirement <br />in addition to the amount calculated based on the monthly return flow factor. Return flow obligations <br />will be calculated based on the actual timing of diversions. After accounting for return flow obligations, <br />the Taylor Et Gill Ditch shares delivered to recharge are projected to generate a total of 138.02 acre- <br />feet of available replacement water during this plan period. <br />The remaining 193.21 acre-feet of farm headgate delivery associated with the Taylor Et Gill Ditch <br />shares will be delivered directly to the Cache La Poudre River for replacement purposes during the <br />period of April through August. Deliveries will be made at the Taylor Et Gill Wasteway located as shown <br />in Figure 1. The wasteway is a headgate on the ditch that flows to an approximately 8.5 -acre pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.