Laserfiche WebLink
Volume IX - GOB PILE #2 <br />APPENDIX A <br />Coal Mine Waste Disposal Area <br />Salvage Volumes _ <br />Area *Topsoil Topsoil - - - <br />- - -- - - <br />Acres <br />Depth Ft. <br />CY <br />Coverfill Pile 2.3 <br />1.2 <br />4,453' <br />Initial 50 Foot Bench 3.9 <br />Second 50 Foot Bench_ - _- _ - _ -_ 7.7 -- <br />Third 50 Foot Bench 5.8 _ <br />Fourth 50 Foot Bench 2.9 <br />1.2 <br />- 1.2 <br />_ 1.2 <br />1.2 <br />_ 7,550 <br />14,907' <br />11,229, <br />Top of Pile 2.3 <br />1.2 <br />4,453 <br />Gob #2, west half (aka gob #4) 7.4 <br />0.58 <br />6,924 <br />Gob Pile #1 2.7 <br />0.5 <br />2,1781 <br />Gob #2 West Expansion 1.8 <br />1.2 <br />3,485 <br />Gob #2 Expansion-TR76 6.1 <br />1.2 <br />11,810 <br />(Fill in Draw Between Pile #2 and #4) <br />Area between gob #I & <br />Topsoil Stockpile E 0.9 <br />1.2 <br />1,742 <br />Gob #2 Expansion-TR98 1.08 <br />0** <br />0** <br />Borrow Areas*** 3.00 <br />0.5 <br />2,420 <br />Totals 47.88 <br />76,766 (Estimated Value, not actually in stockpr/e) <br />Reclamation Volumes <br />Area <br />Acres <br />Topsoil <br />Depth Ft. <br />Topsoil From <br />CY Stockpile <br />Cover (Regd)1 <br />CY <br />Reclamation Areas <br />Gob #2, west half (aka gob #4) 4.83 <br />0.50 <br />3,896 3,8% <br />27,273 <br />First Bench Pile #2 4.41 <br />0.50 <br />3,557, 3,557 <br />24,902 <br />Second Bench Pile #2 6.50 <br />0.50 <br />5,243 5,243 <br />36,703 <br />Third Bench Pile #2 7.45 <br />0.50 <br />6,010 6,010 <br />42,0681 1 <br />Fourth Bench Pile #2 8.02 <br />Frft Bench Pile #2 8.28 <br />Top of Pile Pile #2 7.07 <br />Coverfill 2.30 <br />gob Pile #1 1.12 <br />0.50 <br />_ _ _ _ 0.50 <br />0.50 <br />0.50 <br />0.50 <br />6,469 6,469 <br />_ 6,679 6,679 <br />5,703 5,703 <br />1,855 1,855 <br />903 903 <br />45,286 <br />46,754 <br />39,922 <br />n/a <br />6,324 <br />Area between gob #1 & 0.9 <br />0.50 <br />726 726 <br />n/a <br />Topsoil Stockpile E <br />Borrow areas 1, & 2 13.00 <br />0.50 <br />,' 21 - <br />- <br />Total: 53. <br />- <br />_Coverfill Material Balance: <br />Coverfill currently in -Place <br />- - <br />43, 3___41,043_ <br />- <br />269,233 <br />- -- <br />79,561 1_ <br />Coverfill in stockpile, available for reclamation <br />79,537 <br />(overfill to be borrowed to complete reclamation <br />112.000 <br />Total, <br />271,098 <br />1 <br />In -Place <br />Required <br />Amount <br />-i <br />CY <br />Coverfill l n -Place: <br />Bench #1 <br />24,902 <br />Gob #2 Benches 2/3/423,829 <br />Gob Pile #1 <br />6,324 <br />W. Gob Pile #2 (aka Gob Pile #4) <br />1 <br />24,506' <br />Subtotal:' <br />_ <br />79,561 Coverfill already m place (3.5'depth) <br />Coverfill Available for reclamation: <br />COVERFILL PILE -West <br />35,000, In Stockpile <br />Coverfill Pile -East <br />44,5371 In Stockpile <br />5Su Qom, <br />79,537', <br />Coverfill Necessary to complete reclamatwn: <br />From Gob Pile #3 Area (to be salvaged) <br />30,000 Estimate <br />Adjacent Borrow area #1 - Gob Pile #2 area 1 <br />52,000 <br />Adjacent Borrow area #2 - Gob Pile #2 area <br />30,000 <br />Total:' <br />112.000 <br />Topsoil <br />In -Place, <br />--VolumeSalvaged, <br />CY <br />---------- ---- - <br />TOPSOIL PILED <br />_ <br />TOPSOIL PILE E <br />- -i- - ------ <br />4 ,524, I6 -Place _ _ <br />37,948, In -Place <br />-------- -- --- - <br />_ _ _ _ _ <br />Topsoil Salvage in Borrow areas 1 <br />2,255' <br />Total: <br />44.727' <br />MOTES' _ __ <br />UNIFORM TOP501L DEP7HA55UMED INORDER TO MATCH QUANTITYGiLCULATED <br />VALUESARE ESTIMATED AND LIKELY DIFFERENT FROM IN -FIELD CONDITIONS <br />PLEASE SEE VOLUMED; SEC77ON 'RECLAMA770N-FOR A DISCUSSION OF THESAL VAGE vs. <br />ACTUAL TOPSOIL VALUES <br />-SAL VAGEAREA M EXTREMEL YROCKY, STEEP SECTION OFSITE, PLEASE SEE TOPSOIL VARIANCESEC770N, VOLUME IDPAGE2 05-50 <br />'* TOPSOIL SALVAGED FROM THEBORROWARF45 WILL BE STOCKPILED IN TOPSOIL STOCKPILE <br />TR -98 App A-1 04/15 <br />