Laserfiche WebLink
The certified report addressing the underdrain system and protective filters will include <br />color photographs taken during and after construction, but before underdrains are <br />covered with excess spoil. If the underdrain system is constructed in phases, each phase <br />shall be certified separately. The color photographs accompanying each certified report <br />will be taken in adequate size and number with enough terrain or other physical features <br />of the site shown to provide a relative scale to the photographs and to specifically and <br />clearly identify the site. <br />TR -98 -15- 01/15 <br />