My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-10_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2015-07-10_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:05 PM
Creation date
7/13/2015 8:02:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
7/10/2015
Doc Name
Cost Estimate
From
Jim Stark
To
Rob Zuber
Type & Sequence
MR66
Email Name
JRS
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Southfield Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: Minor Revision <br />66 Permit/Job#: C1981014 <br />Task #: MR66A00 State: Colorado <br />Date: 3/3/2015 County: Fremont <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C014-MR66A00 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />MR66A01 <br />MR66A02 <br />MR66A03 <br />Regrade Borrow Area <br />DOZER <br />1 <br />1 <br />1 <br />0.50 <br />$126.00 <br />$167.00 <br />$631.00 <br />Replace Topsoil to Borrow Area <br />DOZER <br />0.66 <br />Reseed Borrow Area <br />REVEGE <br />1.00 <br />TOTAL O & P = <br />$201.93 <br />SUBTOTALS: <br />2.16 <br />$924 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% <br />Total = <br />$18.66 <br />Performance bond: 1.05% <br />Total = <br />$9.70 <br />Job superintendent: 1.08 hrs <br />Total = <br />$81.17 <br />Profit: 10.00% <br />Total = <br />$92.40 <br />TOTAL O & P = <br />$201.93 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$1,125.93 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />7.22% <br />Total = <br />$81.29 <br />Reclamation management and/or administration: <br />5.30% <br />$59.67 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$342.90 <br />TOTAL BOND AMOUNT (direct + indirect) = $1,266.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.