My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-10_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2015-07-10_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:05 PM
Creation date
7/13/2015 7:13:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
7/10/2015
Doc Name
Adequacy Response #1
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR103
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245-4101, FAX: (970) 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />July 7, 2015 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />Jason Musick <br />Division of Reclamation, Mining & Safety R 0 <br />1313 Sherman St., Room 215� at�or. <br />Denver, CO 80203 o{Recsa/e�y <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Technical Revision 103, Suspend Some Monitoring Stations <br />Adequacy Response #1 <br />Permit C-1996-083 <br />Dear Mr. Musick: <br />DRMS' letter dated June 24, 2015 transmitted its adequacy review for the referenced technical <br />revision. On behalf of Bowie Resources LLC, following are its responses to the DRMS' comment <br />and concerns. <br />1. DRMS - Based on the information provided in the TR -103 application, monitoring site CWI-DH- <br />58 is requested to be terminated due to the fact that it has been replaced with monitoring site <br />CWI-DH-58A. According to approved permit page 2.05-1331, site CWI-DH-58 is an upgradiant <br />well completed in the Upper B -Seam and above and below. The proposed replacement site <br />CWI-DH-58A is not listed on the approved pages 2.05-1331 or 2.05-131. Proposed replacement <br />page 2.05-131 identifies site CWI-DH-58A as, Upper B -Seam. Please provide information as to <br />the formation or seam that site CWI-DH-58A is completed in and a revised page 2.05-133i to <br />include information associated with site CWI-DH-58A. <br />BRL - CWI-DH-58A is completed in the B -Seam. Amended page 2.05-1331 is enclosed. <br />2. DRMS - According to approved page 2.05-1331, sites DH -25 and DH -38 are completed in the <br />Upper D -Seam and serve as upgradiant monitoring wells. Based on the table accompanyingthe <br />TR -103 cover letter, both sites DH -25 and DH -38 are currently active for water level only. These <br />two sites are required to be monitored for field parameters quarterly and a full suite sample <br />will be conducted semi-annually. In order to meet the requirements of Rule 2.05.6(3) and to <br />ensure that the quality of groundwater should not be impacted, stated in the PHC section of <br />the Bowie No. 2 PAP, please provide information addressing which sites will be utilized in <br />place of DH -25 and DH -38 respectfully, to serve as upgradiant groundwater wells for the <br />
The URL can be used to link to this page
Your browser does not support the video tag.