Laserfiche WebLink
Mr. Brock Bowles <br />July 8, 2015 <br />Page 2 <br />e) On the most recent submittal of Map 2.05.3(3)-3 Haul Road Alignment Details, it shows that <br />the mine progress will continue through the year 2020. This date is inconsistent with the text <br />in Section 2.05.2 and Map 2.05.2-1 Mine Plan -Estimated Area for Life of Mine which state <br />mining will take place until 2018. Also, the lines depicting the yearly progress are different <br />than Map 2.05.2-1 and do not reflect the current position of the active pit. Please correct <br />Map 2.05.3(3)-3 to be consistent with the current permit. If WFC desires to change the timing <br />of active mining, please submit a separate revision to address this matter. <br />Response: The lines on Map 2.05.3(3)-3 depicting the yearly progress are consistent with the <br />most recent version of Map 2.05.2-1 which was approved per TR -06. However, the dates on <br />Map 2.05.2-1 are not consistent with the text in Section 2.05.2. Therefore, the text in Section <br />2.05.2 has been changed to be consistent with the currently approved Map 2.05.2-1. <br />f) The Meehan property is shown as being owned by Meehan. This is inconsistent with Map <br />2.03.4-1 Surface Ownership and Leases which shows that WFC owns the property. Please <br />clam. <br />Response: The surface ownership on Map 2.05.3(3)-3 for the Meehan property has been <br />changed to indicate WFC is the surface owner which is consistent with Map 2.03.4-1. <br />Included in this adequacy response package are revised materials in response to your adequacy <br />comments and a change sheet index to assist with incorporating the revised materials into the permit <br />document. If you have any questions regarding the enclosed adequacy review responses, please contact <br />Tony Tennyson at 970-824-1232 or ttennvson,c tristategt_org. <br />Sincerely, <br />Daniel J. Casirro <br />Senior Manager <br />Environmental Services <br />DJC:TT:pvt <br />Enclosures <br />cc: Frank Ferris (via email) <br />Chris Gilbreath (via email) <br />Jason Storey (via email) <br />Tony Tennyson (via email) <br />File: G474 -11.3(21)c-4 <br />AN EQUAL OPPORTUNITY/ AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy' Cooperative <br />