Laserfiche WebLink
18k <br />The response is adequate. <br />181 <br />The response is adequate. <br />18m <br />The Division is looking at the as -built drawing for the West Taylor Pond with a latest revision date of <br />7/26/2012. If there is a more recent drawing, please advise. It appears that the emergency spillway <br />elevation on the drawing is still different than the one in Table 4 (albeit a small difference). A greater <br />difference is the height of the riser: the table says 16 feet but the drawing indicates that it is 10.5 feet. <br />This was calculated by subtracting the elevation of the top of the horizontal pipe (7460.5) from the <br />elevation of the top of the spillway (7471). Please explain this or revise the error. <br />18n <br />The response is adequate. <br />18o <br />The response is adequate. <br />18p <br />The response is adequate. <br />18q <br />The Division did not find the revised pages in the submittal (adequacy response). Please provide these. <br />18r <br />The response is adequate. <br />18s <br />The response is adequate. <br />18t <br />The Division did not find the revised pages in the submittal (adequacy response). Please provide these. <br />