Laserfiche WebLink
r <br />Page 4 of 5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acresTotal <br />acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />14.62 <br />w/to soil <br />p <br />14.62 <br />mulched w/ <br />-0- <br />F1462 <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acresTotal <br />acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />N/A <br />replacement <br />6-12" <br />rate (tons): <br />N/A <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />Broadcast <br />application <br />I <br />N/A <br />I <br />application <br />N/A <br />method: <br />method: <br />method: - <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NOXXX 94X <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? YES XjAQXXX4G7S91C <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabihzed in accordance with Rule 3.1.9(1)? YES XJ <br />if "NO" please explain: <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? C)bUX N/A <br />/ <br />17. Are all hazardous materials stored within approved spill containment structures? YES 5ti XXA)" <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES )OODWO C <br />19. Is your basis for legal right to enter still valid? YES XIDO(X <br />20. Does your permit require you to submit monitoring information annually? XNSXX)J&U N/A <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.RS. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the <br />permit* boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. <br />UPDATED <br />MAP ATTACHED: YES <br />