Laserfiche WebLink
M,E <br />12. rima future (Post -mining) ch age): <br />JU Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary resent land use check one : <br />ElCropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) 0 Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Use of scraper, front-end loader, dozer, and trucks. <br />FIGeneral <br />Agriculture(GA) <br />Wildlife HabitagWL) <br />hidustrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />15. On Site Processing: FI Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid -producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The current 9.9 acre pit is nearing the end of its material. The expansion will allow small tracts <br />to be opened as material is needed. As each new tract is opened, reclamation will begin on the <br />