Laserfiche WebLink
EXHIBIT E — Reclamation Plan <br />The primary reclamation plan for the pit is to slope all areas at a slope no steeper than 3:1. The <br />entire pit area will then have topsoil replaced, then be seeded according to recommendations <br />received from the Haxtun Natural Resource Conservation Service. <br />a) The pit area has topsoil averaging 6" in depth. That topsoil will be stockpiled and <br />returned during the reclamation process. <br />b) Slopes no greater than 3:1 will be left in the completed pit. <br />c) Sloping will occur as material is mined. <br />d) The access road will be left intact once the mining is complete. Any internal haul <br />roads utilized during mining will be reclaimed. <br />e) There are no other reclamation treatments to note for this site. <br />A cost estimate for final reclamation has been prepared and is attached. <br />