Laserfiche WebLink
June 30, 2015 <br />2.4 Placement and Compaction of Fill Materials <br />There was some sloping work done this quarter on the north part of the dump between the <br />7575' and 7600' levels. <br />At the end of the second quarter of 2015, the north half of the dump was at the 7600' through <br />7630' levels. On the south half of the fill was at the 7600' through the 7740'elevation. <br />Photograph 6 depicts the west facing slope of the fill in the area where the slope of the fill is at <br />3H:1 V. <br />Photograph 6: West Side Fill 3H:1 V Face Looking Southeast (6/25/2015) <br />2.5 Revegetation <br />No topsoil was placed on the fill this quarter. <br />3.0 References <br />Agapito Associates, Inc. (2009), "Horse Gulch Fill Stability Analysis" submitted to Trapper <br />Mining, Inc., May 29. <br />Colorado Division of Minerals and Geology (1980), "Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining," revised 9/14/05, Section 4.09.1. <br />I✓ <br />