Laserfiche WebLink
June 30, 2015 <br />Horse Gulch Fill Quarterly Inspection Report <br />Second Quarter 2015 <br />Table of Contents <br />1.0 Introduction <br />2.0 Critical Construction Periods <br />2.1 <br />Removal of All Organic Material and Topsoil <br />2.2 <br />Placement of Underdrainage Systems <br />2.3 <br />Installation of Surface Drainage Systems <br />2.4 <br />Placement and Compaction of Fill Materials <br />2.5 <br />Revegetation <br />3.0 References <br />certify that this report was prepared by me. <br />01,11111 IIH till', <br />�,CJ • RtE ,p •.tJ'' '. <br />- '° 43864 cn• <br />cx-. <br />Tonia Marie Perkins ��������•.••••.�.����` <br />CO PE 43864SON AL <br />Mining Engineer 1111a„pt,,,,,,O,��` <br />Trapper Mining, Inc. <br />1 <br />2 <br />3 <br />3 <br />3 <br />4 <br />5 <br />5 <br />61 <br />