My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-06_GENERAL DOCUMENTS - C1981013 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981013
>
2015-07-06_GENERAL DOCUMENTS - C1981013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:56 PM
Creation date
7/7/2015 11:12:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
General Documents
Doc Date
7/6/2015
Doc Name
Proposed Decision and Findings of Compliance (RN-6)
From
DRMS
To
New Elk Coal Company, LLC
Permit Index Doc Type
Findings
Email Name
LDS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Findings of the Colorado Division of Reclamation, Mining and Safety <br />for the <br />Golden Eagle Mine <br />Explanation of Findings <br />Pursuant to Rule 2.07.6(2) of the Regulations of the Colorado Mined Land Reclamation Board <br />for Coal Mining, and the approved state program, the Division of Reclamation, Mining and <br />Safety or the Board must make specific written findings prior to issuance of a permit, permit <br />renewal or permit revision. These findings are based on information made available to the <br />Division that demonstrates that the applicant will be able to operate in compliance with the <br />Colorado Surface Coal Mining Reclamation Act and the Regulations promulgated pursuant to <br />the Act. <br />The findings in the following sections required by Rule 2.07.6(2) are listed in accordance with <br />that Rule. The findings and specific approvals required pursuant to Rule 2.07.6(2)(m) are listed <br />in accordance with Rule 4 and are organized under subject or discipline subtitles. <br />This findings document is updated upon permit renewal, which occurs every five years for most <br />mines. This is the renewal findings document for the Golden Eagle Mine, which has a five-year <br />permit term. The following findings were reevaluated and updated if necessary to reflect <br />changes which have occurred during the past permit term. Any stipulations from the original <br />permit and findings document or subsequent revisions that have been totally resolved to the <br />satisfaction of the Division, have been removed from this document. <br />Summary of Stipulations <br />Stipulations are a binding part of the mining permit. At the time of Permit Renewal 96 (RN -06) <br />there are no active or un -resolved stipulations to the Golden Eagle mining permit. <br />Section A - Rule 2.07.6 <br />1. The permit application is accurate and complete. All requirements of the Act and these <br />rules have been complied with (2.07.6(2)(a)). <br />2. Based on information contained in the permit application and other information available <br />to the Division, the Division finds that surface coal mining and reclamation can be feasibly <br />accomplished at the Golden Eagle Mine (2.07.6(2)(b)). <br />3. The assessment of the probable cumulative impacts of all anticipated coal mining in the <br />general area on the hydrologic balance, as described in 2.05.6(3), has been made by the <br />Division. This assessment entitled "Purgatoire River CHIA" is available for inspection at <br />the offices of the Division. The Division finds that the operations proposed under the <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.