My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-29_REPORT - M2007031
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2007031
>
2015-06-29_REPORT - M2007031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:45 PM
Creation date
7/7/2015 9:38:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007031
IBM Index Class Name
REPORT
Doc Date
6/29/2015
Doc Name
Annual Fee, Report and Map
From
The Turquoise Connection, Inc.
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />d <br />w/topsoil <br />O <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />graded: <br />0 <br />Total acres <br />fertilized w/ <br />Topsoil <br />replacement <br />\ <br />U <br />Mulch application <br />rate (tons): <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />V <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan?an <br />NO N/A <br />If "YES", indicate the weed species, control area, control type, application rate and treatment the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized * accordance with Rule <br />�3.n1..9(1)? <br />If "NO" please explain:0� ulo� /� ��'�'�`" ` <br />A� <br />YES NO N/A <br />YES NO N/A <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining plan md Office of the State <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/A <br />17. Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO N/A <br />19. Is your basis for legal right to enter still valid? NO <br />20. Does your permeit require you to submit monitoring information annually? NO N/A <br />If "Y�', please attach t e equire monitoring results to tly�s ual Report. <br />21. As required by Colorado Mined Land Re lamation ct and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R,S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the <br />permit boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. <br />UPDATED <br />MAP ATTACHED: <br />
The URL can be used to link to this page
Your browser does not support the video tag.