Laserfiche WebLink
(Not %or DP Ent)y) <br />Combined Surface and Underground <br />Permitted <br />Actual <br />Proposed <br />8. Mineral ownership: <br />Indicate currently permitted acreage for <br />each <br />(as of 01/01/2015) <br />Active <br />Federal: acres <br />3,056.0 <br />NA <br />NA <br />State: acres <br />0.0 <br />NA <br />NA <br />Private: acres <br />434.0 <br />NA <br />NA <br />Indian: acres <br />0.0 <br />Nil <br />NA <br />9. Surface ownership: <br />Indicate currently permitted acreage for <br />each <br />(as of 01/01/2015) <br />Federal: acres <br />70.2 <br />70.2 <br />70.2 <br />State: acres <br />55.7 <br />55.7 <br />55.7 <br />Private: acres <br />3967.1 <br />3967.1 <br />3967.1 <br />Indian: acres <br />0.0 <br />0.0 <br />0.0 <br />10. Affected area in acres <br />1540.8 <br />1387.0 <br />0.0 <br />11. Disturbed area in acres <br />1534.5 <br />1291.5 <br />0.0 <br />12. Acreage of area reclaimed in previous <br />permit term <br />as of 01/01/2015 <br />A. Backfilled and graded <br />NA <br />71.6 <br />NA <br />B. Reto soiled <br />NA <br />83.9 <br />NA <br />C. Reseeded <br />NA <br />76.0 <br />NA <br />13. Acreage for which bond has been released <br />A. 60 percent - Phase I <br />NA <br />1270.4 <br />NA <br />B. 85 percent - Phase II <br />NA <br />797.8 <br />NA <br />C. 100 percent -Phase III <br />NA <br />0.0 <br />NA <br />14. Renewal Term Requested (Years) <br />NA <br />NA <br />5 <br />Note: If the application contains proposed (nexv) acreage, then a permit revision application form must also be <br />completed for those acreages. <br />15. Type of I\/line Check one): I I Underground X Surface <br />Combined Surface and Underground <br />Loadout <br />Other <br />16. Current Permit Status Check one): <br />Active <br />Temporary Cessation <br />I <br />Permanent Cessation <br />(Reclamation Only) <br />Suspended <br />17. Current Estimated Life of Mine in Tears <br />