Laserfiche WebLink
Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.8091 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />1.000 <br />1.225 <br />1.000 <br />0.929 <br />1.000 <br />773.34 LCY/hr <br />3866.7 LCY/hr <br />Fleet size: 5 Dozer(s) <br />Unit cost: $0.565/LCY <br />Total job time: <br />Total job cost: <br />25.59 Hours <br />$55,918 <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />