Laserfiche WebLink
Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.8778 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />1.000 <br />1.329 <br />1.000 <br />0.929 <br />1.000 <br />997.80 LCY/hr <br />9978 LCY/hr <br />Fleet size: 10 Dozer(s) <br />Unit cost: $0.438/LCY <br />Total job time: <br />Total job cost: <br />307.68 Hours <br />$1,344,811 <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />