Laserfiche WebLink
SECTION I - INTRODUCTION <br />Purpose of this Document <br />This document presents the results of the Midterm Permit Review (MT7) of the Trapper <br />Mining, Inc. (TMI) Trapper Mine. The Colorado Division of Reclamation, Mining and Safety <br />(Division) conducted this review for the purpose of fulfilling the requirements of the Colorado <br />Surface Coal Mining Reclamation Act (Act), and the Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining (Regulations). <br />Organization of this Document <br />This document is divided into the following three parts: <br />Part I - Introduction <br />Part II— Summary of Operations, Revisions to Permit, <br />Violations, Stipulations, Variances, and Bond <br />Part III — Requested Revisions of Permit Application <br />Midterm Review Requirements of the Regulations <br />Section 2.08.3 of the Regulations requires the Division to conduct a general review of each <br />mining and reclamation permit prior to the middle of the permit's term (2 '/2 years). Based on <br />this Midterm Review, for good cause shown, the Division may require the permittee to revise <br />or modify the permit in order to ensure compliance with the Act and Regulations. <br />Table 1 lists the other Sections of the Regulations that require a Midterm Review of specific <br />aspects of each permit. <br />Trapper Midterm 2015 Findings TNL-2.docx Page 1 <br />