Laserfiche WebLink
Spoil pile: 1.000 <br />Push gradient: 1.225 <br />Altitude: 1.000 <br />Material Weight: 0.929 <br />Blade type: 1.000 <br />Net correction: 0.8091 <br />Adjusted unit production: 629.08 LCY/hr <br />Adjusted fleet production: 1258.16 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.695/LCY <br />Total job time: 10.18 Hours <br />Total job cost: $8,898 <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />