Laserfiche WebLink
Spoil pile: 1.000 <br />(DOZ-OC) <br />Push gradient: 1.225 <br />(CAT HB) <br />Altitude: 1.000 <br />(CAT HB) <br />Material Weight: 0.929 <br />(CAT HB) <br />Blade type: 1.000 <br />(PAT) <br />Net correction: 0.8091 <br />Adjusted unit production: 629.08 LCY/hr <br />Adjusted fleet production: 5661.72 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 9 Dozer(s) <br />Unit cost: $0.695/LCY <br />Total job time: 61.52 Hours <br />Total job cost: $242,021 <br />