Laserfiche WebLink
11. As required by Rule 6.3.4(2), please provide an estimate of the actual costs to reclaim the site <br />based on what it would cost the State of Colorado using an independent contractor to <br />complete reclamation. The unit costs should include estimates for the following activities: <br />backfilling and grading. Unit costs (cost per cubic yard), volumes, haul or push distances, <br />and grades must he included when backfilling and grading are part of the Reclamation Flan. <br />Please see the revised reclamation cost estimate attached below. This estimate is based on the <br />previously approved NOI and an increase in tons. The new estimate below considers 10,000 CCY of <br />material to be moved during the waste rock pile grading task. There will be additional financial warranty <br />reclamation estimates submitted with any technical revisions that have been proposed herein this <br />document. For example, the third adit will have an additional reclamation estimate submitted with the <br />technical revision for this aspect of the project. <br />