My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-27_REVISION - M1977301
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977301
>
2015-05-27_REVISION - M1977301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:27 PM
Creation date
6/30/2015 5:16:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
REVISION
Doc Date
5/27/2015
Doc Name
Request SR01
From
Pete Lien & Sons
To
DRMS
Type & Sequence
SR1
Email Name
MAC
WHE
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT TRANSPORT RIG COST <br />Shift Basis: <br />Cost Data Source: <br />Truck Tractor Description: <br />Truck Trailer Description: <br />1 per day <br />CRG Data <br />Generic On -Highway Truck Tractor, 6X4, Diesel Powered, 400 HP <br />Generic Folding Gooseneck, Drop Deck Equipment Trailer <br />Available Rig Capacities <br />0.25 Tons 26 -SO Tons <br />51t Tons <br />Haul Trip Cost/hr./fleet Return <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Hclper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />ROOERTS NON ROADABLE EQUIPMENT <br />Machine Description <br />Weight/Unit(Tons) Ownership <br />Cost/hr./unit Haul Rig Cost/hr./unit fleet Size <br />Haul Trip Cost/hr./fleet Return <br />Trip Cost/hr./fleet DOT Permit Cost/fleet <br />CAT D8T - SSU <br />47.41 <br />$62.67 <br />$117.55 <br />1 $180.22 <br />$117.55 <br />$250.00 <br />CAT 623G <br />41.35 <br />$75.81 <br />$117.55 <br />4 $773.44 <br />$470.20 <br />$1,000.00 <br />CAT 770D <br />37.54 <br />$48.57 <br />$117.55 <br />6 $996.72 <br />$705.30 <br />$1,500.00 <br />CAT 992K <br />107.88 <br />$174.83 <br />$125.45 <br />1 $300.28 <br />$125.45 <br />$250.00 <br />Subtotals <br />$2,250.66 <br />$1,418.50 <br />$3,000.00 <br />EQUIPMENT HAUL DISTANCE AND TIME <br />Traoscr .tatir,n rude Time Robert- s <br />Haul Time (Hours) 0.44 <br />Roberts <br />Nearest Major City or To!!�d45 <br />Fort Collins <br />Total One -Way Travel Di20 <br />miles <br />Average Travel Speed: <br />Subtotals (Hours): <br />Traoscr .tatir,n rude Time Robert- s <br />Haul Time (Hours) 0.44 <br />Return Time (Hours) <br />0.44 <br />Loading Time (Hours) <br />1.5 <br />Unloading Time (Hours) <br />1.5 <br />Subtotals (Hours): <br />3.88 <br />Job Time (2 Round Trips) <br />7.76 <br />Total Cost <br />$21,713.40 <br />'Assuming Two Round Trips for Hauling <br />Roberts Quarry; DRMS File No. M-1977-301 Surety Reduction Request <br />
The URL can be used to link to this page
Your browser does not support the video tag.