Laserfiche WebLink
Page 3 of 4 <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br />If "NO" please explain: <br />14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmen liongan)? ' YES NO N <br />o �o �a !� qsc O P <br />15. Are all hazardous materials stored within approved spill containment structures? YES NO rel <br />/A <br />16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring mQrmation <br />annually? YES O N/A <br />If "Yes", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in <br />place and is adequate to fully reclaim the approved prospecting site disturbance(s). I _ f . <br />FINANCIAL WA NT DOC ENTATIQN ATTACHED: 0-- {�`� bO W "`� �" <br />() CaA <br />e oj� r�� s�dl i" 14, <br />18. Pleas use thpace be ow to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />0 /Iwe CA) a <br />GA1J i VL�s �pe�� �c-ol0Cr`I>�.e� <br />r-- <br />-1��� � ��s �e� Ile - <br />J �� .' <br />Ck �1A,rev,-�) <br />C S� �Cti A . <br />