Laserfiche WebLink
to.;' <br />JUN ', ? 2015 <br />tOfdtwt: to ZCIAMATION <br />Mi ERA <br />'' tin+ <br />Permittee Naar(: " 0.1v of (ireelc\ <br />Upc,ration Name. � Trcihct i tikes <br />.'annual Fee Ihle" S 7 9 (►n <br />PetZtttt .' Create' 04 00 <br />112c Annual Report <br />Pcrmit Number: NI -200 1-041) <br />County: l arttttcr <br />Annivcrsary Date: lune (1, 201; <br />(ltrrent B end Arnt: 50 00 <br />I'asc 1 43 <br />According to C.R.S. 34-32.5-116 or 34-3-1-116, each )ear. on the annttcrsary (late of the permit. an operator shall sttbntrt <br />the Annual Ice, in Annual Report and trap showing the extent of current disturbance, to aflicied land. rcgtm _d <br />monitoring inflOrtttalion, reclamation accomplished to date and during the prLmling )car, any flex% disturbance that is <br />anticipated to occut during the upcoming year, art,,- reclamation that wilt be perf'Orrned caring the upcoming \'ear the <br />dates For the beginning ol'active operations, and the (late active operations (cased lite the ,car. <br />Information contained in this report will he te0ew•ed by the I)itisiuti upon receipt and prior to the ucxt comp) ancr <br />inspection of'the site. If; while eompicting this report, you learn that your site is not in compliance with tate Cull's and the <br />act, it is advisable that tite issues he rectified promptl) to avoid possible: critorcemcnt action. <br />I . Is the site Went ificattoil sign posted in accordance with Rule 3.1.12( t ). �Nf ) <br />2 Is the affected area boundary clearly marked in accordanec with Rule 3.1.12(2), 3 <br />N( ) <br />Z. Is the mine site in final reclamation (all matcrial extraction and stockpile renimai is complete):' ITS ti( i <br />11"N S." please nate time limits related to completion orreelarnation, Rule 3.1.3. <br />4. What (ti as the date of* last excavation, processing or haulms: activity at the rninc`> August 2013 <br />5. Does the mine operate more than ISO days per )rai <br />No ► <br />It' "N(i". please review Rule 1.13 to assure that your mine is in compliance. <br />b. Has (tris mime been granted: a) approval (if `FEIM11 ?R;XRY (TI -SSA I 10 Status." <br />l FS NO <br />h) approval Cor iN"IFRIM I FI FN OPI•.RA I10N:' <br />1'F. 't) <br />Number of acres currently affected (mining,+incomplete and or unreleasedrcclatti<rtion) <br />80 <br />S. Numher of acres that were: new 1) affected during the current report \cat <br />0 <br />9. Number of acres that were reclaimed during the current rellort year. <br />0 <br />I t►. L,tumrted tim acreage t(i be aftected tel the next report \ecu". <br />0 <br />11, f•stimatcd acres to be reclaimed in the next report year. <br />30 <br />12. Total acres in various stges of reclamation, since permitted miniiT actiN rtres het!aw <br />I Total acres <br />Total acres I'r+tal acres l Dial acre, <br />hacktilled: i 0 <br />seeded w' 0 ! \( topsoll QmuJettcdl w <br />Q <br />tip)roved mix: replaced: apprdned rnulrlt: <br />Total acre: i <br />Iota! acres 1 opsui! Mulch application <br />graded: 40 <br />i fertilized « { 0 rcplaccnunt i na rate tton,j: <br />na <br />iaped fertilrccr: ! depth (nt.I. <br />j Seel! l'CItdV.CT i titillcil <br />application na application na ; aplrlrcatton na <br />ntcthad: ! nuthod rrnrh +dt <br />L..-_.._.. _.�.-�_._... ..- .... .,......L . . .. a <br />