Laserfiche WebLink
The site is in great condition, the wet spring Inas been very good for <br />establishing vegetation. Ditches and ponds were in good shape. <br />G®b ]Pile #2e <br />The inspection began a the top of fob pile #2. Gob was being <br />hair led t® the top fromn the wash pllamnt. No mixing ng with dreier gob <br />was necessary, the moisture ree co ntemnt appeared t® be close to <br />optimum. umn. G®b Inas been placed in the draw between the m�j�ere east <br />diversion ditch and wha t used t® be the top of gob pile #2. Work <br />will likely begin this week grubbing the area to the north of g®b <br />pile #2 in preparation 1f®re gob placement once TR -98 receives final <br />The upper diversion ditches were walked above gob pile #2➢ and <br />the west expansion to gob pile #2 (gob pile #4). Overall, they are in <br />good shape, but do require a some maintenance. nteffnaffnee. To the east of gob <br />pile #2, two medium sized rocks are nen the channel section and <br />meed to be removed. The channel is still ifu milehn®ffnally but removal of <br />the rocks should be done as s®®mil as possible. The channel section <br />above the center pile area, and the west expansion area have a lot of <br />weeds along the ®n >tslope and channel bottoms. The channel <br />segment should be graded to remove the weeds in the channel <br />bottom, and as time allows, the weeds on the ®n >tslo pe of the <br />channel sb®nnlld be sprayed. <br />Vegetation on western reclaimed section looks every, very good. <br />There are some weeds along the bench roads that should be <br />sprayed as time allows this summer. The wet spring has produced <br />tremendous growth and vegetative cover on this reclaimed section <br />of the g®b pile. <br />G®b ]Pile #3e <br />The current g®b hauling ng sched lle is to pile #2 during ng the daffy, then <br />to g®b pile #3 during the night shift. Stockpiled gob, and g®b that <br />had been hassled the previous night was being processed on the top <br />pad. Ditch J3 and Culverts J-1 and H-1 were inspected and are in <br />good shape. The n ffnderedreanffn continues to ill®w. <br />Ponds: <br />Pond ]F➢ currently holds about 4.09 of water and sediment. <br />Pond C held about 29 of water and sediment. <br />Pond D was nearly empty, it held approximately F ®f water and <br />sediment. <br />Pond JET was dry. <br />Ponds B held about 29 of water and sediment. <br />Pond J held approximately 29 of water and sediment. 2 <br />No adverse conditions were noted at any pond. <br />