My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-26_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2015-06-26_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:43 PM
Creation date
6/29/2015 9:04:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
6/26/2015
Doc Name
Weekly Report
From
JE Stover & Associates, Inc.
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The site is in great condition, the wet spring Inas been very good for <br />establishing vegetation. Ditches and ponds were in good shape. <br />G®b ]Pile #2e <br />The inspection began a the top of fob pile #2. Gob was being <br />hair led t® the top fromn the wash pllamnt. No mixing ng with dreier gob <br />was necessary, the moisture ree co ntemnt appeared t® be close to <br />optimum. umn. G®b Inas been placed in the draw between the m�j�ere east <br />diversion ditch and wha t used t® be the top of gob pile #2. Work <br />will likely begin this week grubbing the area to the north of g®b <br />pile #2 in preparation 1f®re gob placement once TR -98 receives final <br />The upper diversion ditches were walked above gob pile #2➢ and <br />the west expansion to gob pile #2 (gob pile #4). Overall, they are in <br />good shape, but do require a some maintenance. nteffnaffnee. To the east of gob <br />pile #2, two medium sized rocks are nen the channel section and <br />meed to be removed. The channel is still ifu milehn®ffnally but removal of <br />the rocks should be done as s®®mil as possible. The channel section <br />above the center pile area, and the west expansion area have a lot of <br />weeds along the ®n >tslope and channel bottoms. The channel <br />segment should be graded to remove the weeds in the channel <br />bottom, and as time allows, the weeds on the ®n >tslo pe of the <br />channel sb®nnlld be sprayed. <br />Vegetation on western reclaimed section looks every, very good. <br />There are some weeds along the bench roads that should be <br />sprayed as time allows this summer. The wet spring has produced <br />tremendous growth and vegetative cover on this reclaimed section <br />of the g®b pile. <br />G®b ]Pile #3e <br />The current g®b hauling ng sched lle is to pile #2 during ng the daffy, then <br />to g®b pile #3 during the night shift. Stockpiled gob, and g®b that <br />had been hassled the previous night was being processed on the top <br />pad. Ditch J3 and Culverts J-1 and H-1 were inspected and are in <br />good shape. The n ffnderedreanffn continues to ill®w. <br />Ponds: <br />Pond ]F➢ currently holds about 4.09 of water and sediment. <br />Pond C held about 29 of water and sediment. <br />Pond D was nearly empty, it held approximately F ®f water and <br />sediment. <br />Pond JET was dry. <br />Ponds B held about 29 of water and sediment. <br />Pond J held approximately 29 of water and sediment. 2 <br />No adverse conditions were noted at any pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.