Laserfiche WebLink
DRILLING AND EXPLOSIVES PREPARATION TIME <br />Total Drilling Length: <br />Unadjusted Drilling Rate: <br />Drilling Time: <br />Job Condition Corrections: <br />Site Altitude <br />Altitude Adjustment <br />Job Efficiency Factor <br />Adjusted Drilling Rate <br />Explosives Prep. Time <br />JOB TIME AND COST <br />5,816 <br />82.00 <br />111.44 <br />7,100 <br />0.95 <br />0.67 <br />52.19 <br />83.34 <br />Total Job Time: <br />Unit cost: $2.856 per cu. yd. Total Job Cost: <br />194.77 <br />linear feet <br />feet/hour <br />hours <br />feet <br />(DRMS est.) <br />(CH. Exc. HB) <br />feet/hour <br />hours <br />Hours <br />