Laserfiche WebLink
048 <br />049 <br />050 <br />051 <br />052 <br />053 <br />054 <br />055 <br />056 <br />057 <br />058 <br />059 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />067 <br />068 <br />069 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />090 <br />091 <br />092 <br />093 <br />094 <br />095 <br />096 <br />097 <br />098 <br />100 <br />101 <br />102 <br />103 <br />104 <br />105 <br />Regrade East Pyeatt Access Road (1, 2 and 3) DOZER <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />8.75 <br />$11,995.00 <br />$6,267.00 <br />$3,672.00 <br />$3,672.00 <br />$15,422.00 <br />$11,995.00 <br />$17,625.00 <br />$9,449.00 <br />$4,651.00 <br />$6,119.00 <br />$15,177.00 <br />$3,672.00 <br />$3,672.00 <br />$3,672.00 <br />$74,168.00 <br />$3,280.00 <br />$12,288.00 <br />$8,746.00 <br />$12,813.00 <br />$9,402.00 <br />$7,871.00 <br />$3,280.00 <br />$3,367.00 <br />$787.00 <br />$4,329.00 <br />$1,312.00 <br />$4,548.00 <br />$3,105.00 <br />$4,928.00 <br />$197,842.00 <br />$17,724.00 <br />$193.00 <br />$6,480.00 <br />$1,205.00 <br />$2,496.00 <br />$2,560.00 <br />$477,951.00 <br />$842,366.00 <br />$213,156.00 <br />$155,064.00 <br />$2,006,159.00 <br />$376,630.00 <br />$551,640.00 <br />$966,339.00 <br />$5,251.00 <br />$124,143.00 <br />$270,554.00 <br />$115,405.00 <br />$364,413.00 <br />$135,853.00 <br />$50,422.00 <br />Regrade Grouse Access Road DOZER <br />4.57 <br />Regrade West Flume Access Road DOZER <br />2.68 <br />Regrade East Flume Access Road DOZER <br />2.68 <br />Regrade Deal Access Road DOZER <br />11.25 <br />Regrade Horse Access Roads (Horse and Horsel) DOZER <br />8.75 <br />Regrade West Horse Access Road DOZER <br />12.86 <br />Regrade Middle Flume Access Roads (1, 2 and 3) DOZER <br />6.89 <br />Regrade Oak Access Roads DOZER <br />3.39 <br />Regrade Sage Access Roads DOZER <br />4.46 <br />Regrade Johnson Access Road DOZER <br />11.07 <br />Regrade Elk 1 Access Road DOZER <br />2.68 <br />Regrade East Buzzard Access Road DOZER <br />2.68 <br />Regrade Far East Buzzard Access Road DOZER <br />2.68 <br />Regrade K -Pit Haul Roads (TR -106) DOZER <br />54.11 <br />Rip BC Walk Road RIPPER <br />2.24 <br />Rip D Pit Haul Roads (D1, D3, D4, D5 and RIPPER <br />Dmain) <br />8.40 <br />Rip West Ash Haulroads (West Ash, West Ash RIPPER <br />and West Ash 2) <br />5.98 <br />Rip LOM Haul Roads (F2 and F2 -G5) RIPPER <br />8.76 <br />Rip A Pit Haul Roads (Middle A and North A) RIPPER <br />6.43 <br />Rip F Pit Haul Roads (FMain, F0, F 1, F3, F4 and RIPPER <br />FO1) <br />5.38 <br />Rip Middle Z and F2 Haul Roads RIPPER <br />2.24 <br />Rip East Middle Z and Z3 Haul Roads RIPPER <br />2.30 <br />Rip EF Haul Roads RIPPER <br />0.53 <br />Rip East A Haul Roads (East A and East A Split) RIPPER <br />2.96 <br />Rip G5 Haul Roads RIPPER <br />0.89 <br />Rip Access Road (Tasks 042-061) RIPPER <br />3.11 <br />Rip K Pit Haul Roads (KMain, K1, K2, K3) RIPPER <br />2.12 <br />Rip K Pit Haul Roads (TR 106) RIPPER <br />3.37 <br />Regrade Coyote Impoundment DOZER <br />288.69 <br />Regrade Middle Pyeatt Impoundments DOZER <br />Impoundment (1,2, 3) <br />51.73 <br />Regrade Far East Buzzard Impoundment DOZER <br />0.56 <br />Regrade Sage Impoundments (1 and 2) DOZER <br />18.91 <br />Regrade West Horse Impoundment DOZER <br />3.52 <br />Regrade Impoundment H DOZER <br />7.29 <br />Regrade Industrial Waste Pond DOZER <br />7.47 <br />Replace Topsoil on Ash Dump Pits SCRAPERI <br />118.97 <br />Replace Topsoil on D/E Pits SCRAPERI <br />209.68 <br />Replace Topsoil on Z Pits SCRAPERI <br />53.06 <br />Replace Topsoil on F Pit Area SCRAPERI <br />38.60 <br />Replace Topsoil on G Pit Area Including K -Pit SCRAPERI <br />499.36 <br />Replace Topsoil on East A Pit Area SCRAPERI <br />93.75 <br />Replace Topsoil at West Panel Ponds, BC Road SCRAPERI <br />and Shop <br />137.31 <br />Replace Topsoil at East Panel Ponds and A Road SCRAPERI <br />240.53 <br />Re -topsoil an additional 2.3 acres in K -Pit SCRAPERI <br />1.31 <br />Seed D Pit Range A -B REVEGE <br />204.60 <br />Seed F Pit Range A -B REVEGE <br />445.90 <br />Seed Z Pit Range A -B REVEGE <br />190.20 <br />Seed G Pit Range A -B REVEGE <br />600.59 <br />Seed Ash Dump Range A -B REVEGE <br />223.90 <br />Seed East A Pit Range A -B REVEGE <br />83.10 <br />