Laserfiche WebLink
SAFEGUARDING UNDERGROUND OPENINGS <br />Task description: Close portal and vent opening <br />Permit Action: Reclamation Cost <br />Site: The Liberty Project Estimate Petmit/Job#: P2015012 <br />PROJECT IDENTIFICATION <br />Task #: 03A State: Colorado <br />Date: 6/11/2015 County: Quay _ <br />User: THM <br />Agency or organization name: DBMS <br />UNIT COSTS <br />Abbreviation: None <br />Filename: P012 -03a -------- <br />Opening <br />_ <br />Opening Description <br />Dimensions <br />Closure Method <br />Quantity <br />Unit <br />Unit <br />Cost <br />Total Cost <br />Backfill debris before <br />40 CY <br />Adit closure - backfilling <br />40.00 <br />CY <br />$3.00 <br />$120.00 <br />blasting adit <br />er cu. d. <br />Close portal by blasting <br />8'x 8' <br />Adit closure - blasting with <br />1.00 <br />EA <br />$3,601.38 <br />$3,601.38 <br />explosives(per opening) <br />Close vent shaft <br />3 x 3 <br />Shaft closure - concrete <br />9.00 <br />SF <br />$108.77 <br />$978.93 <br />cap, poured -in-place (per <br />sq. ft. <br />Job Hours: 10.00 ' Total Cost: $4,700.31 <br />