Laserfiche WebLink
Loader Worksheet Cont'd Task # 04A Page 2 of 2 <br />Total Travel Time: 0.5170 minutes <br />Total Cycle Time: 1.0620 minutes <br />Load Bucket Caoaci <br />Rated Capacity: 0.53 LCY (heaped) <br />Bucket Fill Factor: 1.050 Other - moist loam (100-110%) 1.050 <br />Adjusted Capacity: 0.56 LCY <br />Job Condition Correction Factors <br />Site Altitude: 11000 feet <br />Source <br />Altitude Adj: 0.89 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.74 multiplier <br />Unadjusted Hourly Unit Production: _31.44_ <br />LCY/Hour <br />Adjusted Hourly Unit Production: 23.23 LCY/Hour <br />Adjusted Hourly Fleet Production: 23.23 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: I <br />Unit cost: $2.697 <br />Loader(s) <br />/LCY <br />Total job time: 13.97 <br />Total job cost: $875 <br />Hours <br />CIRCES Cost Estimating Software <br />