My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-03_PERMIT FILE - C1981041 (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981041
>
2015-04-03_PERMIT FILE - C1981041 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:01 PM
Creation date
6/22/2015 12:47:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Permit File
Doc Date
4/3/2015
Doc Name
A-2 pg CRDA1-1 to RSS-53
Section_Exhibit Name
Tab 13 Appendix 13-2 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />• <br />1• <br />Pond 9 <br />Interim Drainage Check <br />The original or operational design of pond 9 provided for the collection of run-off from a portion <br />of the Roadside Refuse Disposal Area "RSRDA" and the drainage area below the south <br />diversion ditch, ref. Exhibit 6B. Interim drainage is defined as that period of time after <br />reclamation that Pond 9 will remain in place. This period could range from three to ten years. <br />During the interim period, Pond 9 will receive run-off from the RSRDA upper diversion ditch and <br />the lower bench of the RSRDA. <br />During the interim period, Pond 9 will collect run-off from Drainage Area D, ref. Appendix 14-6 <br />page 14-6-1 i. Drainage Area D, which is the drainage area for the RSRDA upper diversion <br />ditch, encompasses 72 acres broken down as follows: <br />Curve Number 64 67.6 Acres B Soil Group, Sage -grass 20% cover <br />Curve Number 86 4.4 Acres B Soil Group, fallow bare soil <br />The lower bench of the RSRDA contributes another 3.0 acres of fallow bare soil to the drainage <br />area of Pond 9. Therefore the drainage area and run-off volume for Pond 9 is: <br />10 -year event/ <br />Area Acres Curve Number direct run-off Run-off Acre Feet <br />Upland 67.6 <br />Disturbed 7.4 <br />I <br />Total Required Water Capacity - Acre Feet <br />Pond 9 Actual Water Capacity - Acre -Feet <br />1.4/0.01 0.07 <br />1.4/0.43 0.26 <br />0.33 <br />0.66 <br />The actual water capacity of Pond 9 is listed in the yearly impoundment inspection report dated <br />April 8, 2002. <br />Pond 9 has an emergency spillway comprised of a half 30 -inch diameter culvert. The rated <br />capacity of this emergency spillway is 23 cfs, ref. appendix 13-2 page RSS-18. The RSRDA <br />upper diversion ditch has a 100 -year design flow of 8.8 cfs. Therefore, the existing emergency <br />spillway is considered adequate to handle the 25 -year event. <br />Sediment volume will not be considered for this analysis. Pond 9 has a design sediment <br />capacity of 0.33 acre-feet, ref. appendix 13-2 page RSS-15. The sediment will be cleaned from <br />Pond 9 when the sediment accumulation approaches 60% of the design volume. <br />The calculations and inforr�apgOERb�6 j on this page were prepared by me or under my <br />direct supervision during�#�?gKht q��002, and the information presented is true and <br />correct to the best of mfr dge anQc�D. <br />*�9 �s <br />v4ezA *e <br />Imes E. StoveiM.E. <br />RSA`86ed Profe�8A AI Engineer <br />�: Pof j�l c0c4 o. 19230 <br />Append 13-2 •, RSS-15i <br />6/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.