Laserfiche WebLink
7 <br /> -5- <br /> • Location in Application <br /> INFORMATION CATEGORY NARRATIVE MAPS <br /> 2.05.3 Operation Plan: Permit I II-2 *Operation Plan - <br /> Area 2.05.3 <br /> 2.05.3(1 ) Production Methods and <br /> Equipment III-4 <br /> 2.05.3(2) Operation Description III-6 <br /> 2.05.3(3) Mine Facilities III-7 <br /> 2.05.3(4) Ponds, Impoundments and III_9 <br /> Diversions <br /> 2.05.3(5) Topsoil (removal and III-12 <br /> storage) <br /> 2.05.3(6) Overburden III-15 <br /> 2.05.3(7) Coal Handling Structures III-1 5 <br /> i <br /> 2.05.3(8) Coal Processing Waste and III-15 <br /> Non-Coal Processing Waste <br /> 2.05.3(9) Underground Development N/A <br /> Waste <br /> 2.05.3(10) Return of Coal Processing N/A <br /> Waste to Abandoned <br /> Workings <br /> 2.05.4 Reclamation Plan IV-1 <br /> 2.05.4(2)(a) Timetables IV-1 <br /> 2.05.4(2)(b) Reclamation Cost Estimates IV-3 <br /> 2.05.4(2)(c) Backfilling and Grading IV-3 *Post-mining <br /> topography - <br /> 2.05.4(2)(c) <br /> 2.05.4(2)(d) Topsoil (Redistribution) IV-5 <br /> 2.05.4(2)(e) Revegetation IV-8 <br /> i <br />