My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-05_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2015-06-05_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:29 PM
Creation date
6/22/2015 9:49:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
6/5/2015
Doc Name
Letter & Application (Emailed)
From
New Elk Coal Company
To
DRMS
Type & Sequence
MR123
Email Name
LDS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�woF co�� <br />:e. COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />s X876 � <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 012 Date: 06 105 12015 <br />Permittee: New Elk Coal Company LLC <br />New Elk Mine <br />Street: 12250 State Highway 12 <br />City: Weston <br />State: CO Zip Code: 81091 _ <br />Brief Description of Revision: Transfer water monitoring wells previously permitted <br />and bonded through NOI-X-2011-232-01 into the <br />for these wells- <br />Public <br />ells <br />Public Notice Attached: Yes❑ No ❑✓ (Required for PRs and TRs) <br />Bond Increase: Yes❑ No❑ Federal ❑ Non -Federal ❑ Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed (+/-) _ _ 0 _ Acres <br />Permit (+/-) _ _ 0 . _ Acres <br />Affected (+/-) _ _ 0 . _ Acres <br />Mineral Ownership - <br />Mineral Private (+/-) _ _ _Acres <br />Mineral Federal (+/-) _ _ 0 . _ Acres <br />Surface Ownership - <br />Private Land (+/-) _ _ 0 _ Acres <br />Federal Land (+/-) _ _ 0 _ Acres <br />State Land (+/-) _ _ 0 _ Acres <br />Mineral State (+/-) _ _ 0 —Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.