My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-19_REPORT - C1981019 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2015-06-19_REPORT - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:08:34 PM
Creation date
6/19/2015 12:40:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
6/19/2015
Doc Name
2nd Quarter 2015 South Taylor Pit
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
RDZ
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Tavlor Fill Inspection Certification <br />On June 10, 2015, 1 inspected the South Taylor Fill areas, which includes the East Taylor Fill <br />and the West Taylor Fill, identified on Map 23A and Map 45 of the approved permit. The <br />purpose of this inspection was to observe the status of the fill placement. This inspection is <br />necessary to satisfy the requirements of CDRMS Rule 4.09.1(1)(c) and Rule 4.09.1(11). <br />Weather conditions at the time of inspection were approximately 60°F and cloudy. <br />West Taylor Fill with A -A' and B -B' Underdrain Area No new activity has occurred within the <br />permanent West Taylor Fill since last inspection. The East Tributary of the West Taylor fill has <br />been rip -rapped up to the 7850' elevation (approximately). The West Tributary of the West <br />Taylor fill has been rip -rapped up to the 7820' elevation. Dumping continues at the 8100 <br />elevation of the temporary spoilpile. <br />The current water level reading of the piezometer well was 223.5 feet from the ground surface, <br />unchanged from the previous quarter. <br />No structural weakness, signs of instability, or other hazards were noted at the time of <br />inspection. <br />East Taylor Fill with C -C' Underdrain Area: During the first quarter of 2014, the Colowyo <br />"025" Rock Crusher was moved to the flat pad above the East Taylor fill, and was placed at the <br />8000' elevation. At the time of inspection, minimal crusher fines have been produced at the 025 <br />crusher site. Last quarter, the Colowyo "102" dragline was moved to the west side of the East <br />Taylor fill, and parked onto a pad below the 025 rock crusher. The dragline pad was a pre- <br />existing pad that required only minimal reworking. No activity other than rock crusher operations <br />has taken place within the East Taylor fill during this quarter. <br />Design requirements for the spoil pile are addressed in Volume 13, Exhibit 21, Item 1, <br />Introductory Letter. Inspection requirements during construction are further detailed in Volume <br />12, Section 4.09. <br />No structural weakness, signs of instability, or other hazards were noted at the time of <br />inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.