Laserfiche WebLink
U.S. DEPT. OF THE INTEIWOVf-D <br />OFFICE OF SURFACE MINING Q15 <br />Mine Site Evaluation JUN 15 2 <br />State Proeram _S oanlamatton, <br />1. Permittee/Person <br />FORMERLY: GARFIELD ENERGY CORP <br />2. Address <br />214 8TH ST STE 204 <br />3. City 4. State <br />GLENWOOD SPRINGS CO <br />5. Zip Code 6. Phone Number <br />81601 (303)945-8588 <br />7. Operator Name, if Different than Permittee <br />FORMERLY BLACK ROCK MINING COMPANY <br />FThF�� <br />9. Permit Number <br />10. Permit Type <br />C-81-046 <br />NP <br />11. Field Visit Date <br />12. Purpose <br />13. SRA Present <br />6/8/2015 I <br />r0_115 10 <br />--dd->m <br />14. Permit Status <br />15. Site Status <br />16. FacilityT e <br />AB3 <br />FR <br />B <br />17. OSM Office # <br />18. CCID # <br />19. Land Code <br />140 I <br />I0 <br />20- M.S.H.A. I� <br />21. State Abbrev. <br />22. Coun Burrough <br />05-00256 <br />CO <br />GARFIELD <br />8. Mine Name 23. AVS Permittee Entity ID Number 24. State Office <br />SUNLIGHT MINE 72131 <br />25. Hours 26. Signature Block 27. Reviewing Official: <br />2.0 a. Permit Review -- <br />3.0 b. Site Visit Time Signature: Sign ture:t, <br />RI <br />7.0 c. Travel Time Christine Belka, ID#182 Review Date: _ <br />d. Report Writing Printed Name: mm - dd - yyyy <br />3.0 <br />Date: 6/16/2015 Is Supplemental MSE Page Used Y/N Fy <br />Permit Type - Item 10 IP = Interim Program PP = Permanent Program NP = No Permit <br />Purpose Type Codes - Item 12 CCR..Citizen Complaint Referral (non -site visit <br />Oxx... Oversight RFx..Reclamation Fees CC ..... Citizen Complaint (initial site visit) <br />Axx... Assistance Fxx ... Federal Actions CCF... Assistance <br />Joint Inspection - Item 13 A joint Inspection Is when a state Inspector accompanies an OSM Inspector at any time during the review of the mine site <br />Permit Status - Item 14 AB Abandoned: All surface and underground coal mining activities have ceased and operator <br />A Active: Coal mining activities occurring or permitted but not yet has left the site without completing reclamation as defined in 30 CFR 840:11(g). <br />disturbed. ABI Bond Forfeiture: Bond forfeiture officially in process or completed and reclamation in <br />IN Inactive (Permanent Program Permit): Phase II completed or progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit): AB2 Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to reclaim site, <br />Coal mining completed and reclamation activities initiated. but site not reclaimed to Program standards. <br />BR Bond Release: Reclamation completed and State Regulatory AB3 Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority(RA) has released all of the bond (Phase III Release). NA Not Applicable: When site is unpermitted. <br />Site Status - Item 15 MC Mining Complete: No mining activity on site, site NS Non -Site Visit: Status of site not determined. <br />ND No Disturbance: No coal mining and reclamation regraded and awaiting bond release. Forfeiture Pending: The RA is pursuing actions to <br />operations have been started. TC Temporary Cessation: The RA has granted FP revoke the permit, collect the performance bond(s), <br />EX Coal Exploration: Coal exploration operations have cessation of mining pursuant to 30 CFR and/or reclamation of forfeited site is in progress. <br />started and where coal mining operations have not 816/817:13(b). FR Forfeited and Reclaimed: Forfeiture reclamation <br />begun. P1 Phase I Release: At least Phase I bond release completed. <br />AP Active Coal Producing: Coal surface mining granted for entire permitted area. For interim FO Abandoned Site: Abandoned site that is permitted but <br />activities are occurring. permits, partial bond release. there is no bond. <br />AN Active Non -Producing: Active non -producing facility P2 Phase II Release: At least Phase II bond release WC Wildcat: Coal mining and reclamation operations have <br />such as tipple or preparation plant. for the entire permitted area. or are taking place and the activity is not covered by <br />NM No Mining: The Permit Status is active, site is not in P3 Phase III Release: Reclamation completed and the required permits from the RA. <br />Temporary Cessation, no surface coal mining the RA has released all bond. <br />activity, and site not regraded. <br />Facility Type Codes - Item 16 D .... Ancillary (Haulroad, Conveyor, and/or Rails H ... Exploration Permits K .... Government Financed Construction Exemption <br />A .... Surface E .... Refuse and/or Impoundment I .... Notice of Intent to Explore L .... Remining site permitted under 30 CFR 785.25 <br />B .... Underground F .... Loading Facility and/or Tipple J .... Exempt 16 and 2/3 <br />C .... Preparation Plant G .... Stockpiles <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from small businesses about Federal agency <br />enforcement actions. The Ombudsman will annually evaluate the enforcement activites and rate each agency's responsiveness to small business. If you are a small business (a business with 500 or <br />fewer employees including those of affiliates) and wish to comment on the enforcement or compliance activities of OSM, call 1 -888 -REG -FAIR (1-888-734-3247). <br />Page 1 <br />