Laserfiche WebLink
1 RECEIVED <br />JUN 16 2015 <br />D1VIS106W c -F pn AMATlO 112c Annual Report <br />M fig. „, <br />i FEE PUi <br />Page 2 of 3 <br />Permittee Name: <br />as Ammas uounty <br />Permit Number: <br />M-2000-053 <br />Operation Name: <br />Castillo Pit <br />County: <br />Las Animas <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />June 12, 2015 <br />Permit Acreage: <br />18.74 <br />Current Bond Amt: <br />$0.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />(_� NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). S NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. G <br />4. What was the date of last excavation, processing or hauling activity at the mine? 6 <br />5. Does the mine operate more than 180 days per year YES NO <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YE NO <br />b) approval for INTERMITTENT OPERATION? YES NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. 6' — <br />9. Number of acres that were reclaimed during the current report year. �2 <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. / <br />2� <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />backfilled: <br />Total acres <br />seeded w/ <br />approved mix: <br />Total acres <br />w/topsoil <br />replaced: <br />Total acres <br />mulched w/ <br />approved mulch: <br />(� <br />Total acres <br />graded: <br />Total acres <br />fertilized w/ <br />Topsoil <br />replacement <br />;; to <br />Mulch application <br />rate (tons): <br />,, i <br />U <br />apvd fertilizer: <br />depth (in.): <br />t <br />Seed <br />Fertilizer <br />Mulch , <br />applicationapplication <br />application <br />n /' <br />/ " / <br />method: <br />method: <br />method: <br />