Laserfiche WebLink
RECEIVED <br />JUN 16 2015 <br />pMsIo Mc,, TM 2c Annual <br />Permittee Name: Ska civil -est Permit Number: M-1976-059 <br />Rocky Mountain District <br />Inc. <br />Operation Name: Cortez Pit County: Montezuma <br />Annual Fee Due: $791.00 Anniversary Date: June 17, 2015 <br />Permit Acreage: 136.40 1 1 Current Bond Amt: 1 $18,838.00 <br />Page 2 of 3 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. ►��2�0�5 <br />4. What was the date of last excavation, processing or hauling activity at the mine? 20 Z <br />5. Does the mine operate more than 180 days per year? YES NO <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES NO <br />b) approval for INTERMITTENT OPERATION?IU NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). 3 <br />8. Number of acres that were newly affected during the current report year. -� <br />9. Number of acres that were reclaimed during the current report year. 4� <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. — <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />w/topsoil <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons/ac): <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />