Laserfiche WebLink
'V LAMAR INDUSTRIAL PARK <br />GRA VEL PIT <br />PERMIT # M-1987-078 <br />H: \DRAWING FILES\Gravel Pits\Gravel Pit LIP\Grpitlip.dwg <br />NORTH GATEWAY PARK <br />FT <br />S 89'28'00" E <br />-----1914.72 <br />Z OAD— — — — —N 89'28'00" W — — — <br />_ - <br />478.31 FT <br />� <br />O <br />:E1 <br />REA AREA N PROCESS\ <br />V? I Or BENG RECLAIMEDp <br />p 3.004 ACRES <br />7.649 ACRES GRAVEL PIT <br />2284 ACRES RECLAIMED <br />O R.,Won Na AR -1 <br />p0 <br />,O i <br />.d b <br />O <br />S 89'28'00" E <br />S 89'28'00" E <br />1436.41 FT <br />379.,36-FT- <br />79.36FTLAMAR <br />LAMARINDUSTRIAL PARK GRAVEL PIT PRIOR YEAR <br />iNOTIFICATION <br />800.00' <br />31 1 32 S 89'36'00" E <br />Disturbances to existing land are shown on this map for the year <br />2014-2015. <br />Reclamation on the East 2.284 Acres accomplished to date at the <br />site. Released from reclamation responsibility, May, 2001. <br />Land in the process of being reclaimed is designated on the map. <br />This area will not be utilized for future mining operations. <br />Only LOAc new disturbances are expected to occur during the <br />upcoming year and include only utilizing existing stockpiled <br />material, where shown on this map. Should new mining occur <br />in 2015-2016, it will be minimal, to extract 200 tons. <br />Active operations began November 1st, 2012. <br />Active operations still on going in 2015. <br />Approximately 100 tons of material were utilized from <br />excavated and stockpiled material in the Active operations <br />referenced mining months. <br />L� <br />NORTH <br />SCALE 1"= 250' <br />Updated May 2015 <br />LAMAR INDUSTRIAL PARK <br />