Laserfiche WebLink
SUNNYSIDE GOLD CORPORATION <br />STORMWATER SITE MAP <br />Terry Tunnel <br />Permit Area: 66.5 acres <br />Disturbed Area: 49.5 acres <br />Reclamation in Progress: 49.5 acres <br />Reclamation Plan Implemented <br />Y11)- /0r77�- 97E <br />0 200 <br />SCALE: 1" = 200' <br />