Laserfiche WebLink
�LO RECEIVED <br />JUN 10 2015 <br />MI�� DIVISION OF RECLAMATION, � F <br />112 Annual Report <br />Page 2 of 3 <br />ermittee Name: <br />Sunnyside Gold Corp <br />Permit Number: <br />M-1977-378 <br />Operation Name: <br />Sunnyside Gold Mine <br />County: <br />San Juan <br />Annual Fee Due: <br />$633.00 <br />Anniversary Date: <br />June 10, 2015 <br />Permit Acreage: <br />148.93 <br />Current Bond Amt: <br />$60,534.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YESNO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? 1111 � <br />Does the mine operate more than 180 days per year YES <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES SNOb) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). 131 , :-to <br />8. Number of acres that were newly affected during the current report year. 0 <br />9. Number of acres that were reclaimed during the current report year. C7 <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. Q <br />12. Total acres in various stages of reclamation, since permitted mining activities began. <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />1 31 '�� <br />w/topsoil <br />mulched w/ <br />(cam <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />1 I, Z4 <br />fertilized w/ <br />131 4(o <br />replacement <br />rate (tons): <br />I Ton 1ac <br />apvd fertilizer: <br />I depth (in.): <br />Seed <br />H,0-0 s"d <br />Fertilizer <br />; (ry S -ted <br />Mulch <br />11(14,C J, -,C4 <br />application <br />0-,0( <br />application <br />a., a( <br />application <br />a -,o( <br />method: <br />0nd <br />method: <br />,,,%A r,9f <br />method: <br />k N T1-,r.rw4r <br />