Laserfiche WebLink
7r��*" of -coo <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />fir' <br />. , <br />*,* 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 <br />1876 <br />JZEQUEST_FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- See attached Site Name: Multiple % <br />County Kit Carson TR#_ C �— (QRAI, Uve on10 <br />, ermittee:Kit Carson County r�,rrP•r���cM <br />Operator (If Other than Permittee): <br />Permittee Representative: Dave riOrnUng <br />. n r <br />E, N 0 LU I J <br />--Q}1vgGQW OF °"f''Ah,,arInti <br />MINING AND SAFETY <br />Please provide a brief description of the proposed revision: <br />To allow importation of plant growth medium (topsoil) if needed in the following attached list of <br />gravel pits. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />1 IOc, 1 11, 112 construction <br />materials, and 112 quarries $216 ✓ <br />112 hard rock (not DMO) $175 ❑ <br />1 l Od, 112d(1, 2 or 3) $1006 ❑ <br />