Laserfiche WebLink
e�o"co� COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />y$ MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866-3567 <br />* 1876 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE/PROSPECTING ID#: <br />MINERAL: COUNTY: <br />Hector Placer <br />M-2011-009 <br />Gold Park <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: INSP. TIME: <br />Monitoring <br />Michael A. Cunningham <br />May 28, 2015 09:30 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />IGWT Mining, Inc. <br />Mike London, Rhonda London <br />112 - Hard Rock Regular Operation <br />REASON FOR INSPECTION: <br />BOND CALCULATION TYPE: <br />BOND AMOUNT: <br />Normal I&E Program <br />None <br />$50,000.00 <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />NA <br />None <br />None <br />WEATHER:IN%JTO"S <br />SIGNATURE: <br />SIGNATURE DATE: <br />Clear <br />I June 9, 2015 <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Hydrologic Balance <br />PROBLEM/POSSIBLE VIOLATION: Problem: The Division observed water seeping from the south end of the <br />lower settling pond. This is a problem for failure to minimize disturbances to the prevailing hydrologic balance <br />as required by Rule 3.1.6. <br />CORRECTIVE ACTIONS: The Operator shall reconstruct the earthen berm at the south end of the lower settling <br />pond so that the crest is a minimum of three feet above the water level. In addition, the earthen berm shall be <br />appropriately compacted to ensure that water does not seep from the pond. <br />CORRECTIVE ACTION DUE DATE: 6/23/15 <br />Page 1 of 7 <br />