My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-08_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2015-06-08_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:34 PM
Creation date
6/10/2015 8:23:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
6/8/2015
Doc Name
TR23
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR23
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Protection Facility Certification <br />Henderson Mine — Permit No. M-1977-342 <br />Technical Revision 23 <br />Ute Park Extraction Wellfield Project —Phase I <br />The Ute Park Extraction Wellfield Project —Phase I was approved as Technical Revision No. <br />23 to Mine Permit No. M-1977-342 on June 11, 2014. This project is located at Climax <br />Molybdenum Company's Henderson Mill in Grand County. The project involved the <br />construction of an extraction well and support infrastructure, including a pipeline, vault, <br />electrical power line, and instrumentation at a location downgradient from 1 Dam at the Mill. <br />The undersigned was responsible for the design of the pipeline and measurement vault. <br />The Henderson Mill and contractors have substantially completed the construction of the <br />project and it has been tested and determined to be functional. Record Drawings of the <br />project are attached. Also attached is a memorandum dated December 17, 2014 <br />describing the results of the hydrostatic pressure test of the discharge pipeline. <br />Pursuant to Rule 7.3.2, the Professional Engineer that has signed and sealed below certifies <br />that the project was completed in general conformance with the approved design as <br />submitted to the Division of Reclamation, Mining, and Safety. This statement is based in <br />part on information that has been provided by others. <br />Steven Nr!gftV11P!E. <br />W. W. Wheeler and Associates, Inc. <br />. a /Z --4—z <br />O!5"" <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.