Laserfiche WebLink
643.3 <br />665. <br />al <br />GENERAL DETAIL <br />MOUNT 13.8kV/480V A / Y POLE MOUNTED <br />TRANSFORMER WITH PRIMARY DISCONNECT <br />CENTRALIZED LOCATIONS. <br />POLE 206 - TAP TO SLACK SPAN <br />POLE 206A - 112.5 KVA XFMR DROP POLE TO 480V <br />DISTRIBUTION PANEL <br />POLE 206 TO POLE 206A - 60 FT, VERTICAL <br />ARRANGEMENT ROLLED TO HORIZONTAL <br />SECONDARY POWER FROM XFMR TO WELL LOCATION. <br />BURIED CONDUIT SCHED 40 PVC <br />POLE 206A TO WELL MLEX-1 - 432 FT <br />ISSUE FOR CONSTRUCTION 08/15/14 CW SR DRAWN BY CAW 1202014 NDERSON OPERATIONS <br />MLEX7 AS BUILT 01/05/15 CW SW CHECKED BY EEC 0&30/14 TAILINGS & WATER SITES <br />APPROVED BY. EEC 06M/14 EXTRACTION WELLFIELD <br />APPROVED BY n SITE GENERAL ARRANGEMENT <br />SCALE: 1/8'-1' SAFETY APP BY; 57$020 1 BHT 10 OF I REV. <br />