My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-08_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2015-06-08_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:01:34 PM
Creation date
6/10/2015 8:23:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
6/8/2015
Doc Name
TR23
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR23
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Protection Facility Certification <br />Henderson Mine — Permit No. M-1977-342 <br />Technical Revision 23 <br />Ute Park Extraction Wellfield Project —Phase I <br />The Ute Park Extraction Wellfield Project -Phase I was approved as Technical Revision <br />No. 23 to Mine Permit No. M-1977-342 on June 11, 2014. This project is located at <br />Climax Molybdenum Company's Henderson Mill in Grand County. The project involved <br />the construction of an extraction well and support infrastructure, including a pipeline, <br />vault, electrical power line, and instrumentation at a location downgradient from 1 Dam <br />at the Mill. <br />The Henderson Mill and contractors have substantially completed the construction of <br />the project and it has been tested and determined to be functional. The systems were <br />designed and installed to meet applicable electrical codes and Henderson design <br />requirements. <br />Modifications to the initial design have been reflected in the attached Record drawings. <br />One such modification being the field installation of three (3) 37.5kVA transformers, as <br />opposed to the design for three (3) 15kVA transformers. This field modification was <br />approved by the engineer of record for the power pole design. <br />Logical Systems LLC (LSI) was responsible for the design coordination and <br />implementation of the electrical systems. The project was completed in general <br />conformance with the approved design as submitted to the Division of Reclamation, <br />Mining, and Safety. This statement is based in part on information provided by others. <br />Cory Whitton Date <br />Logical Systems LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.