Laserfiche WebLink
-2- <br />10. Primary Mine Entrance Location (report in either Latitude/Longitude QR UTM): <br />Latitude/Longitude: <br />Example: (N) 390 44' 12.98" <br />(W) 104° 59' 3.87" <br />Latitude (N): deg 39 min 59 <br />Longitude (W): deg 104 min 37 <br />OR <br />Example: (N) 39.73691* <br />(W) -104.98449° <br />sec 11 25 (2 decimal places) <br />sec 18 11 (2 decimal places) <br />Latitude (N) (5 decimal places) <br />Longitude(W) (5 decimal places) <br />OR <br />Universal Tranverse Mercator (UTM) <br />Example: 201336.3 E NAD27 Zone 13 <br />4398351.2 N <br />UTM Datum (specify NAD27, NAD83 or WGS 84) Nad 83 <br />Easting <br />Northing <br />Zone 12 <br />11. Primary Future (Post-minine) Land Use (check only <br />one): <br />0 Cropland(CR) Pastureland(PL) <br />0 General Agriculture(GA) <br />rte- Rangeland(RL) Forestry(FR) <br />13 Wildlife Habitat(WL) <br />13 Residential(RS) Recreation(RC) <br />13 Industrial/Commercial(IC) <br />Q Developed Water Resources(WR) <br />13 Solid Waste Disposal(WD) <br />12. _Primary Present Land Use (check only one): <br />❑ Cropland(CR) ❑ Pastureland(PL) <br />❑ General Agriculture(GA) <br />El Rangeland(RL) KL Forestry(FR) <br />❑ Wildlife Habitat(WL) <br />11 Residential(RS) rl Recreation(RC) <br />Q Industrial/Commercial(IC) <br />❑ Developed Water Resources(WR) <br />❑ Mining(MN) <br />13. Estimated Beeinnine Date of Contract: April 3, 2015 <br />13.1 Estimated completion date of contract: June 1, 2015 <br />