(e) Reclamation Schedule <br />Fines Disposal Area - Detail 1 on Exh. F <br />Grading will begin in 2016 on the site. A dozer will slope out the gullies and steep sections. A backhoe <br />will pull up sediment from the drainage along the line of Section C -C. Grass seeding, mulching, and <br />fertilizing can occur the next spring. <br />Mine Area - Detail 2 on Exh. F <br />The post law bench above the present bench being mining is not accessible by equipment, so filling with <br />fines is not possible. Grass seed will be broadcast by hand on this bench. Fertilizer and mulch will be <br />hydrosprayed from below on the seed. This upper bench is slightly more than one acre. This seeding <br />work will be done within the next three years. <br />The small piece of disturbance below the mine area and along the access road will be reclaimed within <br />the next three years by filling with quarry fines and seeded. The area may contain a water tank and a <br />hose for truck filling. <br />As mining continues on the second bench and the succeeding six benches, reclamation will occur <br />concurrently. Backfilling of the 30 foot vertical face will be done with quarry fines at a typical 4:1 slope <br />as the mining moves southward. Seeding with fertilizer and mulch will be done on the slope every <br />second or third year and at the end of that bench mining. <br />Old Quarry Fines Disposal Area - Detail 3 on Exh. F <br />More unmarketable fines will be produced at the mine than can be used in that filling and grading. <br />These excess fines will be hauled to the Old Quarry. Fines placement will begin at the eastern "finger" <br />at the 5840' elevation. Successive filling will move work westward and up the slope into the box canyon <br />area. As a section reached its final elevation, the surface will be graded and seeded. Fertilizer and <br />mulch will be applied. Also the drainage channels will be built in that section. <br />(f) Description of Reclamation <br />(i.) Final Grading — Maximum slopes are 4:1 on the vertical bench faces and in the Old Quarry <br />area. Minimum slopes are 1% on the last bench in the Mine Area at 6000' elevation. <br />(ii.) Seeding — see the seed mix on the following page. <br />(iii) Fertilization per acre --120 lbs. N, 200 lbs. P2O5, 60 lbs. K2O; mulching with clean straw at 2 <br />tons/acre crimped in by a disc or hydro -sprayed wood cellulose fiber mulch application at 2,000 lbs. per <br />acre with tackifier at 100 lbs. per acre. <br />(iv) Revegetation — no potted or B&B trees and shrubs will be installed. All plants are seeded. <br />(v) Topsoiling — No topsoil is available on the site. <br />